Fabricated Structural Metal Manufacturing
NAICS 332312 · Federal Contracts & Awards
Fabricated Structural Metal Manufacturing obligated $669,701,264.52 in FY2024 according to USAspending.gov (NAICS 332312). That yearlyTrend cell is 80.9% of the industry extract $828,005,393.46. The page is a join of one NAICS code and one fiscal year, not a mill map, a beam catalog, or a named fabricator roster. 48,387 is the industry extract's award-record count, not a FY2024-only census of tons, plants, or named fabricators.
Key figures
- USAspending records $669,701,264.52 in Fabricated Structural Metal Manufacturing FY2024 obligations (NAICS 332312).
- That cell is 80.9% of the industry's $828,005,393.46 extract-wide total.
- 48,387 is the industry extract award-record count, not a FY2024 census of tons, plants, or named fabricators.
- Obligations are not outlays; FEC donations do not fund this total.
NAICS 332312 joined with fiscal year 2024
The relationship is mechanical: NAICS 332312 crossed with fiscal year 2024 yields one obligation sum. $669,701,264.52 is that sum for Fabricated Structural Metal Manufacturing in 2024. USAspending.gov publishes the figure as a yearlyTrend obligation total. Obligations are commitments recorded on awards, not Treasury outlays. The industry-wide extract remains $828,005,393.46; the FY2024 hub remains a separate parent. This pair does not explain why agencies bought structural metal fabrication coded on awards, and it does not name contractors or award recipients.
Nothing in the facts supports reading $669,701,264.52 as a count of tons, plants, or named fabricators. Prefabricated metal building manufacturing (NAICS 332311) is a different code. Correlation between this NAICS label and FY2024 spending is the join itself, not a causal story. Campaign-finance tables do not fund these USAspending obligations. Place-of-performance and awarding-agency splits are omitted from this packet.
Structural-metal dollars inside the FY2024 book
On the industry side, NAICS 332312 is the Fabricated Structural Metal Manufacturing extract. Its published total across the extract is $828,005,393.46. $669,701,264.52 sits inside that book at 80.9%; the other fiscal-year rows for the same code sum to $158,304,128.94 in this arithmetic. The parent industry page holds the longer series without isolating 2024. Award records in the extract number 48,387; that count is not limited to FY2024.
Structural metal fabrication coded on awards is the NAICS description attached to the awards, not a proof of goods delivered. A later USAspending ingest can restate $669,701,264.52 or $828,005,393.46 without changing the join keys. Do not add the all-industries index into this cell. The 80.9% share is $669,701,264.52 divided by $828,005,393.46, not a budget score or a ranking of industries.
Full analysis: Fabricated Structural Metal Manufacturing obligations, FY2024 →
Questions
- How much did Fabricated Structural Metal Manufacturing obligate in FY2024?
- USAspending.gov records $669,701,264.52 in Fabricated Structural Metal Manufacturing obligations for fiscal year 2024 under NAICS 332312. That amount is a yearlyTrend obligation total, not an outlay and not the industry's $828,005,393.46 extract-wide sum. The join names both Fabricated Structural Metal Manufacturing and FY2024; it does not name contractors or award recipients.
- Is $669,701,264.52 the entire NAICS 332312 USAspending total?
- No. NAICS 332312's extract-wide total is $828,005,393.46. FY2024 is 80.9% of that book. Other fiscal-year rows for the same code are separate cells. Do not add the parent hub into this join. Obligations of $669,701,264.52 are not outlays. USAspending.gov remains the source for the 332312 × 2024 pair.
- Do 48,387 awards equal 48,387 metal fabricators in FY2024?
- No. 48,387 is the Fabricated Structural Metal Manufacturing award-record count in this extract, not a FY2024-only census of fabricators, tons, or named plants. The packet does not split those records by fiscal year or name contractors. USAspending.gov remains the source. Unique recipients are unpublished on this join.
- Do FEC filings explain Fabricated Structural Metal Manufacturing obligations in FY2024?
- No. FEC filings do not explain $669,701,264.52. The source is USAspending.gov. Obligations are not outlays, and donations do not fund NAICS 332312 in FY2024. The pair is NAICS 332312 plus fiscal year 2024. Campaign-finance tables are a different dataset from this yearlyTrend cell.
USAspending.gov NAICS yearlyTrend by fiscal year. Obligations are not outlays. FY figures can be incomplete for the current year.
Industry ties
Companies in the Fabricated Structural Metal Manufacturing industry (NAICS code 332312) have received $828.0M in federal contracts, grants, and other awards since FY2024, across 48K individual awards tracked through FY2026. The largest funding agency is Department of Defense ($775.9M). Spending is concentrated in Alabama, Minnesota, Georgia and 49 other states. All figures below come from USAspending.gov award records.
Total Obligations
$828.0M
Total Awards
48K
States
52
Last Updated
Apr 6, 2026
Yearly Spending Trend
Top 50 Awards in Fabricated Structural Metal Manufacturing
Largest individual obligations in NAICS 332312.
| Award | Recipient | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|---|
CONT_AWD_W56HZV12C0190_9700_-NONE-_-NONE- THIS CONTRACT IS FOR THE PRODUCTION OF DRY SUPPORT BRIDGE SYSTEM. THIS MODIFICATION IS TO PROVIDE SHIPPING INSTRUCTIONS FOR THE GOVERNMENT FURNISHED MATERIAL. | KNDS DEFENCE UK LIMITED | Department of Defense Defense Contract Management Agency | — | — | 2024 | $96,325,857 |
CONT_AWD_W912EQ19C0001_9700_-NONE-_-NONE- VEQ OY4 | FABRITEX, INC. Georgia | Department of Defense Department of the Army | — | HARTWELL, GA-10 | 2024 | $35,401,354 |
CONT_AWD_W909MY24F0018_9700_W909MY24D0002_9700 PRODUCTION AND DELIVERY OF ADVANCED MEDIUM MOBILE POWER SOURCES (AMMPS) GENERATOR SETS. | CUMMINS POWER GENERATION INC. Minnesota | Department of Defense Department of the Army | — | MINNEAPOLIS, MN-05 | 2024 | $32,678,132 |
CONT_AWD_INR17PC00104_1425_-NONE-_-NONE- THE PURPOSE OF THIS UNILATERAL CHANGE ORDER MODIFICATION IS TO INCORPORATE PUMP GENERATOR UNIT HYDRAULIC PIPING CHANGES FROM RFI-221, PG7-12 HCU HYDRAULIC PIPING REV 1, DATED AUGU… | GREENBERRY INDUSTRIAL LLC Washington | Department of the Interior Bureau of Reclamation | — | GRAND COULEE, WA-05 | 2024 | $29,616,974 |
CONT_AWD_W912EK24C0033_9700_-NONE-_-NONE- UPDATE CONTRACT COMPLETION DATE | OCCI INC Missouri | Department of Defense Department of the Army | — | FULTON, MO-03 | 2024 | $24,009,626 |
CONT_AWD_W56HZV21C0097_9700_-NONE-_-NONE- CONTRACT FOR THE PURCHASE OF LINE OF COMMUNICATION BRIDGE (LOCB) SYSTEM IN THE DEVELOPMENT OF A PROGRAM OF RECORD. | ACROW CORPORATION OF AMERICA New Jersey | Department of Defense Department of the Army | — | PARSIPPANY, NJ-11 | 2024 | $23,829,588 |
CONT_AWD_W909MY25F0032_9700_W909MY24D0002_9700 PURCHASE PRODUCTION AND DELIVERY OF ADVANCED MEDIUM MOBILE POWER SOURCES (AMMPS) GENERATOR SETS. | CUMMINS POWER GENERATION INC. Minnesota | Department of Defense Department of the Army | — | MINNEAPOLIS, MN-05 | 2025 | $23,427,031 |
CONT_AWD_W912ES22C0002_9700_-NONE-_-NONE- CHANGE IN SET SCREWS FOR LOCK & DAM MITER GATE ASSEMBLIES | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | PLEASANT VALLEY, IA-01 | 2024 | $19,836,232 |
CONT_AWD_W9123725FA074_9700_W911WN23D0006_9700 CONTRACTOR SHALL FABRICATION AND DELIVER ONE MITER GATE PER THE SCOPE OF WORK AND SPECIFICATIONS TO GREENUP LOCK AND DAM FOR THE US ARMY CORPS OF ENGINEERS, HUNTINGTON DISTRICT | PRECISION BUILD SOLUTIONS LLC Florida | Department of Defense Department of the Army | — | GREENUP, KY-04 | 2025 | $19,112,957 |
CONT_AWD_W9127824C0023_9700_-NONE-_-NONE- FABRICATION AND DELIVERY OF DEMOPOLIS LOCK AND COFFEEVILLE LOCK LOWER MITER GATES AND SPARE PARTS, BLACK WARRIOR-TOMBIGBEE (BWT) PROJECT OFFICE, TUSCALOOSA, AL | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | RUSSELLVILLE, AL-04 | 2024 | $18,269,886 |
CONT_AWD_W912ES24C0016_9700_-NONE-_-NONE- LOCK 3 DOWNSTREAM MITER GATE ASSEMBLY | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | RUSSELLVILLE, AL-04 | 2024 | $18,196,338 |
CONT_AWD_W912QR25FA090_9700_W911WN23D0002_9700 FABRICATE, ASSEMBLE, AND DELIVER ONE (1) UPSTREAM MITER GATE (TWO (2) LEAFS) AND ASSOCIATED EQUIPMENT TO MARKLAND LOCKS AND DAM. | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | OLMSTED, IL-12 | 2025 | $18,169,068 |
CONT_AWD_W912P924C0006_9700_-NONE-_-NONE- NESP L25_CA4020-BULKHEAD FABRICATION & S | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | HARTFORD, IL-13 | 2024 | $17,666,392 |
CONT_AWD_W56HZV21C0098_9700_-NONE-_-NONE- CONTRACT FOR THE PURCHASE OF LINE OF COMMUNICATION BRIDGE (LOCB) SYSTEMS FOR THE DEVELOPMENT OF A PROGRAM OF RECORD (POR). | ACROW GLOBAL LIMITED | Department of Defense Department of the Army | — | — | 2024 | $16,323,971 |
CONT_AWD_W909MY24F0025_9700_W909MY24D0002_9700 INDEFINITE QUANTITY (IDIQ) TYPE CONTRACT FOR THE PURCHASE AND DELIVERY OF 5 THROUGH 60 KILOWATT ADVANCED MEDIUM MOBILE POWER SOURCES (AMMPS) GENERATORS. | CUMMINS POWER GENERATION INC. Minnesota | Department of Defense Department of the Army | — | MINNEAPOLIS, MN-05 | 2024 | $16,236,305 |
CONT_AWD_W909MY24F0034_9700_W909MY24D0002_9700 PRODUCTION AND DELIVERY OF ADVANCED MEDIUM MOBILE POWER SOURCES (AMMPS) GENERATOR SETS. | CUMMINS POWER GENERATION INC. Minnesota | Department of Defense Department of the Army | — | MINNEAPOLIS, MN-05 | 2024 | $15,302,637 |
CONT_AWD_W912ES18C0013_9700_-NONE-_-NONE- LOCK 8 DOWNSTREAM MITER GATE ASSEMBLY | JOHNSON MACHINE WORKS, INC. Iowa | Department of Defense Department of the Army | — | CHARITON, IA-03 | 2024 | $13,043,473 |
CONT_AWD_N6833524F0075_9700_N6833519D0129_9700 F72 AM2 MAT PACKAGE ASSEMBLY | ALFAB INC Alabama | Department of Defense Department of the Navy | — | ENTERPRISE, AL-01 | 2024 | $12,849,913 |
CONT_AWD_W911XK24F0032_9700_W911WN23D0005_9700 BASE: POE GATE 1 FABRICATION & DELIVERY - NO COST TIME EXTENSION. | MARINE DIVING SOLUTIONS, LLC. Colorado | Department of Defense Department of the Army | — | SAULT SAINTE MARIE, MI-01 | 2024 | $12,775,575 |
CONT_AWD_W912EK20C0065_9700_-NONE-_-NONE- INSTALLATION | BATIR PARTNERS JV Illinois | Department of Defense Department of the Army | — | PLEASANT VALLEY, IA-01 | 2024 | $12,619,344 |
CONT_AWD_N6833524F0272_9700_N6833519D0129_9700 F72 AM2 MAT PACKAGE ASSEMBLY | ALFAB INC Alabama | Department of Defense Department of the Navy | — | ENTERPRISE, AL-01 | 2024 | $12,420,473 |
CONT_AWD_W912EQ24C0011_9700_-NONE-_-NONE- EXERCISE OPTION YEAR 1 | FABRITEX, INC. Georgia | Department of Defense Department of the Army | — | HARTWELL, GA-10 | 2024 | $10,460,100 |
CONT_AWD_W912EK23C0044_9700_-NONE-_-NONE- L/D 22 TAINTER GATES - COMPLETION DATE MOD. | STEWARD MACHINE CO INC Alabama | Department of Defense Department of the Army | — | NEW LONDON, MO-06 | 2024 | $9,308,648 |
CONT_AWD_N6833524F0176_9700_N6833519D0129_9700 F72 AM2 MAT PACKAGE ASSEMBLY | ALFAB INC Alabama | Department of Defense Department of the Navy | — | ENTERPRISE, AL-01 | 2024 | $8,160,030 |
CONT_AWD_W912P921C0014_9700_-NONE-_-NONE- MPLD LIFT GATE SUPPLY | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | RUSSELLVILLE, AL-04 | 2024 | $7,911,163 |
CONT_AWD_FA857124P0138_9700_-NONE-_-NONE- THE CONTRACTOR SHALL PROVIDE ALL THE TOOLS, PARTS, MATERIALS, EQUIPMENT, TRANSPORTATION, TRAINING, AND INSTALLATION FOR THE SAFETY OBSERVATION SOLUTION C-130 8-PROP WINGSTANDS FOR… | PETROSYS SOLUTIONS, INC. Texas | Department of Defense Department of the Air Force | — | WARNER ROBINS, GA-02 | 2024 | $7,014,250 |
CONT_AWD_FA857124P0137_9700_-NONE-_-NONE- THE CONTRACTOR SHALL PROVIDE ALL THE TOOLS, MATERIALS, EQUIPMENT, TRANSPORTATION, TRAINING, AND INSTALLATION FOR THE SAFETY OBSERVATION SOLUTION C-130 8-PROP WINGSTANDS FOR B89 TO… | PETROSYS SOLUTIONS, INC. Texas | Department of Defense Department of the Air Force | — | WARNER ROBINS, GA-02 | 2024 | $7,014,250 |
CONT_AWD_W912EK17C0076_9700_-NONE-_-NONE- MOD P00005 - EXTEND COMPLETION DATE | STEWARD MACHINE CO INC Alabama | Department of Defense Department of the Army | — | BIRMINGHAM, AL-07 | 2024 | $6,923,475 |
CONT_AWD_N6833524F0316_9700_N6833521D0053_9700 ORDERING PERIOD 3 - MHU-230M | CHOCTAW DEFENSE MANUFACTURING LLC Oklahoma | Department of Defense Department of the Navy | — | MCALESTER, OK-02 | 2024 | $6,867,252 |
CONT_AWD_W912P524P0066_9700_-NONE-_-NONE- BAR DAM SPILLWAY GATE CHAIN REPLACEMENT - EXERCISING OPTIONS 2, 5, & 6 | GREISEN AEROSPACE, LLC Maine | Department of Defense Department of the Army | — | GRAND RIVERS, KY-01 | 2024 | $6,533,712 |
CONT_AWD_W912P825C0031_9700_-NONE-_-NONE- CALCASIEU RIVER SALTWATER BARRIER SECTOR GATE FABRICATION | SEALEVEL CONSTRUCTION INC Louisiana | Department of Defense Department of the Army | — | THIBODAUX, LA-02 | 2025 | $6,091,000 |
CONT_AWD_W912EK20C0061_9700_-NONE-_-NONE- BASE | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | MORRIS, IL-16 | 2024 | $5,974,136 |
CONT_AWD_W912P821C0007_9700_-NONE-_-NONE- C008 CONTRACTING DELIVERY DATE CHANGE (4) - 08 DEC 2025 | STEWARD MACHINE CO INC Alabama | Department of Defense Department of the Army | — | NEW ORLEANS, LA-01 | 2024 | $5,798,236 |
CONT_AWD_W912P823C0055_9700_-NONE-_-NONE- SECTOR GATE LEAVES FABRICATION (GATE 1) | KING FABRICATION, L.L.C. Texas | Department of Defense Department of the Army | — | LAKE CHARLES, LA-03 | 2024 | $5,705,976 |
CONT_AWD_W911QY24F0085_9700_W911QY24D0002_9700 THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING TO CLIN 0001. | GICHNER SYSTEMS GROUP, INC. Pennsylvania | Department of Defense Department of the Army | — | DALLASTOWN, PA-11 | 2024 | $5,379,936 |
CONT_AWD_W912P820C0033_9700_-NONE-_-NONE- SECTOR GATE LEAVES | STEWARD MACHINE CO INC Alabama | Department of Defense Department of the Army | — | NEW ORLEANS, LA-01 | 2024 | $4,929,711 |
CONT_AWD_W912P422F0040_9700_W911WN22D0005_9700 PAIR OF MITER GATE LEAFS | STEWARD MACHINE CO INC Alabama | Department of Defense Department of the Army | — | BUFFALO, NY-26 | 2025 | $4,929,474 |
CONT_AWD_W912EK25C0018_9700_-NONE-_-NONE- LOCK & DAM 21 TAINTER GATE FAB | SEALEVEL CONSTRUCTION INC Louisiana | Department of Defense Department of the Army | — | THIBODAUX, LA-02 | 2025 | $4,922,200 |
CONT_AWD_W9127822C0032_9700_-NONE-_-NONE- MODIFICATION TO EXTEND DELIVERY DATE FOR BLACK WARRIOR-TOMBIGBEE LOCK SPARE PARTS | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | RUSSELLVILLE, AL-04 | 2024 | $4,635,411 |
CONT_AWD_N6833525F0118_9700_N6833521D0053_9700 ORDERING PERIOD 4 - MHU-230M | CHOCTAW DEFENSE MANUFACTURING LLC Oklahoma | Department of Defense Department of the Navy | — | MCALESTER, OK-02 | 2025 | $4,633,728 |
CONT_AWD_W912QR24F0314_9700_W911WN23D0007_9700 MODIFICATION TO CORRECT DELIVERY DATE ON ITEM 0002 | STEWARD MACHINE CO INC Alabama | Department of Defense Department of the Army | — | WARSAW, KY-04 | 2024 | $4,466,422 |
CONT_AWD_W9123725P0020_9700_-NONE-_-NONE- BALTIMORE HARBOR PIPE ROUND 2 FOR MARIETTA REPAIR STATION, MARIETTA, OH, HUNTINGTON DISTRICT | WINGATE ALLOYS INC Ohio | Department of Defense Department of the Army | — | MARIETTA, OH-06 | 2025 | $4,169,484 |
CONT_AWD_FA486123P0121_9700_-NONE-_-NONE- DESIGN& LABOR FOR NEW AIRCRAFT SUNSHADES AT NELLIS AFB MODIFICATION TO INCORPORATE REQUEST FOR EQUITABLE ADJUSTMENT AND EXTEND CONTRACT COMPLETION DATE. | AGATE STEEL INC Arizona | Department of Defense Department of the Air Force | — | NELLIS AFB, NV-04 | 2024 | $3,549,709 |
CONT_AWD_W911WN23F0010_9700_W911WN22D0002_9700 SLUICE GATE FABRICATION FOR YOUGHIOGHENY RIVER LAKE - EXTEND DELIVERY DATE | ALLTECH ENGINEERING CORP Minnesota | Department of Defense Department of the Army | — | SAINT PAUL, MN-02 | 2025 | $3,514,196 |
CONT_AWD_W9127823C0005_9700_-NONE-_-NONE- MODIFICATION TO EXTEND DELIVERY DATE FOR FABRICATION & DELIVERY OF STENNIS SPILLWAY GATE #2 | PRECISION BUILD SOLUTIONS LLC Florida | Department of Defense Department of the Army | — | GIBSONTON, FL-16 | 2024 | $3,470,686 |
CONT_AWD_W912QR25FA182_9700_W911WN23D0002_9700 FABRICATE, TEST, PAINT, AND DELIVER TWO (2) CULVERT VALVES TO MCALPINE LOCKS AND DAM IN LOUISVILLE, KY | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | RUSSELLVILLE, AL-04 | 2025 | $3,446,200 |
CONT_AWD_W9123723C0005_9700_-NONE-_-NONE- NO COST MODIFICATION TO ADD A WARRANTY SECTION TO THE SOW, ADD FAR 52.246-17 ALT V, AND UPDATE TECHNICAL SPECIFICATIONS TO THE CURRENT REQUIREMENTS FOR SUM FIXED CONE VALVE CONTRA… | INTEGRATED 8(A) SOLUTIONS, INC. California | Department of Defense Department of the Army | — | SUMMERSVILLE, WV-01 | 2024 | $3,400,829 |
CONT_AWD_W912P523F0151_9700_W911WN22D0003_9700 FABRICATE STOPLOGS FOR OLD HICKORY LOCK - POP EXTENSION | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | OLD HICKORY, TN-05 | 2025 | $3,315,668 |
CONT_AWD_W912P421C0011_9700_-NONE-_-NONE- PART OF MITER GATE LEAFS | G & G STEEL INC Alabama | Department of Defense Department of the Army | — | BUFFALO, NY-26 | 2024 | $3,219,561 |
CONT_AWD_N6833524F0179_9700_N6833521D0053_9700 ORDERING PERIOD 3 - MHU-230M | CHOCTAW DEFENSE MANUFACTURING LLC Oklahoma | Department of Defense Department of the Navy | — | MCALESTER, OK-02 | 2024 | $3,188,367 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Top Funding Agencies
View All→Top Recipients
View All→Spending by State
| State | Funding | Awards |
|---|---|---|
| Alabama | $107.1M | 56 |
| Minnesota | $99.2M | 16 |
| Georgia | $63.2M | 31 |
| New Jersey | $56.4M | 47K |
| Iowa | $46.9M | 9 |
| Illinois | $43.4M | 43 |
| Oklahoma | $39.5M | 37 |
| Washington | $35.1M | 25 |
| Missouri | $35.0M | 28 |
| Louisiana | $34.1M | 28 |
| Kentucky | $31.4M | 23 |
| Michigan | $13.9M | 40 |
| New York | $11.7M | 114 |
| Ohio | $8.6M | 82 |
| Pennsylvania | $8.3M | 84 |
| Florida | $7.7M | 75 |
| Virginia | $6.6M | 38 |
| Oregon | $6.5M | 13 |
| California | $6.5M | 204 |
| Tennessee | $6.3M | 23 |
| Indiana | $5.2M | 20 |
| Nevada | $5.2M | 15 |
| West Virginia | $4.0M | 8 |
| Texas | $3.8M | 92 |
| Maryland | $3.0M | 32 |
| Idaho | $2.4M | 9 |
| Kansas | $1.6M | 19 |
| Utah | $1.5M | 12 |
| Connecticut | $1.3M | 6 |
| Massachusetts | $866K | 21 |
| Wisconsin | $861K | 18 |
| Arkansas | $850K | 4 |
| South Dakota | $774K | 4 |
| Arizona | $749K | 9 |
| North Carolina | $712K | 11 |
| Guam | $510K | 1 |
| New Mexico | $467K | 8 |
| Alaska | $368K | 5 |
| Montana | $340K | 9 |
| District of Columbia | $254K | 4 |
| Delaware | $252K | 2 |
| Colorado | $199K | 8 |
| Rhode Island | $185K | 2 |
| Hawaii | $171K | 3 |
| Mississippi | $148K | 8 |
| PW | $104K | 1 |
| Puerto Rico | $62K | 1 |
| Nebraska | $59K | 4 |
| Maine | $47K | 4 |
| South Carolina | $42K | 2 |
| New Hampshire | $16K | 2 |
| Vermont | $7K | 2 |
Source: USAspending.gov · All Industries