MOWA-BARLOVENTO JOINT VENTURE A
GAUTIER, Mississippi
Total Received
$227.8M
Total Awards
29
State
Mississippi
Last Updated
Dec 15, 2025
Yearly Funding Trend
$208.8M24
$19.0M25
Top 29 Awards to MOWA-BARLOVENTO JOINT VENTURE A
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through December 15, 2025.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_FA890324F0023_9700_FA890317D0032_9700 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE SOW DATED 5 OCT 2023, ENTITLED REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT TO REPAIR RUNWAY TOUCHDOWNS AND TURNAROUNDS A… | Department of Defense Department of the Air Force | — | CAPE CANAVERAL, FL-08 | 2024 | $50,569,480 |
CONT_AWD_FA890319F0153_9700_FA890317D0020_9700 REPAIR AWACS APRON PHASE II, REPAIR WEST ALC MAINTENANCE APRON PHASE II AND REPAIR AIRCRAFT PARKING APRON WEST OF HANGER 3102 AT TINKER AFB, OK | Department of Defense Department of the Air Force | — | TINKER AFB, OK-04 | 2024 | $43,745,358 |
CONT_AWD_FA301621F0585_9700_FA890317D0020_9700 THIS IS A CONSTRUCTION PROJECT TO RENOVATE B2792 FORT SAM HOUSTON TEXAS IN ACCORDANCE WITH THE GOVERNMENT PROVIDED DESIGN, AND TECHNICAL AND REGULATORY REQUIREMENTS. | Department of Defense Department of the Air Force | — | SAN ANTONIO, TX-35 | 2024 | $19,465,993 |
CONT_AWD_FA301622F0214_9700_FA890317D0020_9700 THE WORK FOR THIS PROJECT INCLUDES REPAIRS OF THE HEATING AND COOLING SYSTEM, RENEWAL OF FINISHES IN SELECT AREAS OF THE FACILITY AND ELEVATOR INSTALLATION IAW ATTACHMENT 1 DCO RE… | Department of Defense Department of the Air Force | — | JBSA LACKLAND, TX-23 | 2025 | $18,956,730 |
CONT_AWD_FA890322F0127_9700_FA890317D0020_9700 KIRTLAND AFB, NM APRON A CONSTRUCTION WORK IS TO BE PERFORMED IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK DATED 6 JUNE 2022, TITLED REGIONAL ENGINEERING AND CONSTRUCTION CO… | Department of Defense Department of the Air Force | — | KIRTLAND AFB, NM-01 | 2024 | $15,450,237 |
CONT_AWD_FA890324F0068_9700_FA890317D0020_9700 DESIGN-BUILD CONSTRUCTION SERVICES UNDER THE REGIONAL ENGINEERING AND CONSTRUCTION CONTRACT (REC) CENTRAL REGION TO REPAIR TAXIWAY D AT TINKER AFB, OK. | Department of Defense Department of the Air Force | — | TINKER AFB, OK-04 | 2024 | $14,700,618 |
CONT_AWD_FA890322F0045_9700_FA890317D0020_9700 DESIGN BUILD (DB) CONSTRUCTION SERVICES TO RECONSTRUCT MAIN OPERATION APRON AT CANNON AFB, NM. | Department of Defense Department of the Air Force | — | CANNON AFB, NM-03 | 2024 | $9,714,882 |
CONT_AWD_FA252124F0413_9700_FA890317D0032_9700 PROVIDING THE LABOR, EQUIPMENT AND MATERIALS FOR NEW UNDERGROUND WATER UTILITIES AND INFRASTRUCTURE AMENITIES. | Department of Defense Department of the Air Force | — | PATRICK AFB, FL-08 | 2024 | $6,756,316 |
CONT_AWD_FA460023F0073_9700_FA890317D0020_9700 DEMOLISH AND REMOVE THE EXISTING SUBSTATION INSIDE THE LEAN-TO STRUCTURE THAT SERVES THE 400HX EQUIPMENT AT B565 OFFUTT AFB, NE. | Department of Defense Department of the Air Force | — | OFFUTT AFB, NE-01 | 2024 | $6,614,497 |
CONT_AWD_FA487724F0195_9700_FA890317D0010_9700 CONTRACTOR TO FURNISH ALL LABOR, EQUIPMENT, APPLIANCES, AND MATERIALS AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE PROJECT TO PAVE TOW ROAD (IRVINGTON RD TO KOLB RD BRIDGE),… | Department of Defense Department of the Air Force | — | TUCSON, AZ-06 | 2024 | $4,698,564 |
CONT_AWD_FA805124F0045_9700_FA890317D0020_9700 ARNOLD AFB TN AMRS PROJECT | Department of Defense Department of the Air Force | — | ARNOLD AFB, TN-04 | 2024 | $3,894,139 |
CONT_AWD_FA301622F0401_9700_FA890317D0020_9700 THIS REQUIREMENT IS FOR THE RENOVATION OF THE HVAC SYSTEMS OF BUILDING 5450 AND 5460, AND UPGRADE OF THE FIRE ALARM AND MASS NOTIFICATION SYSTEMS OF THE SAME BUILDING, IN ACCORDAN… | Department of Defense Department of the Air Force | — | JBSA LACKLAND, TX-23 | 2024 | $3,585,021 |
CONT_AWD_FA301622F0437_9700_FA890317D0020_9700 TASK ORDER PLACED OFF OF IDIQ FA890317D0020 TO REPAIR BUILDING 181, THE CONFINEMENT FACILITY, LOCATED ON THE CHAPMAN ANNEX, TX. | Department of Defense Department of the Air Force | — | JBSA LACKLAND, TX-23 | 2024 | $3,489,369 |
CONT_AWD_FA805123F0026_9700_FA890317D0020_9700 HOLLOMAN AFB AMRS SYSTEM | Department of Defense Department of the Air Force | — | HOLLOMAN AFB, NM-02 | 2024 | $3,437,476 |
CONT_AWD_FA301623F0358_9700_FA890317D0020_9700 AIRFIELD LIGHTING - TYMX234822 AIRFIELD APPROACH LIGHT SEQUENCE FLASHING (ALSF-1) AND TYMX234820 AIRFIELD LIGHTING CONTROL AND MONITORING SYSTEM (ALCMS-1), JBSA RANDOLPH, TX. | Department of Defense Department of the Air Force | — | RANDOLPH AFB, TX-28 | 2024 | $3,331,136 |
CONT_AWD_FA805124F0044_9700_FA890317D0020_9700 BARKSDALE AFB AMRS PROJECT | Department of Defense Department of the Air Force | — | BARKSDALE AFB, LA-04 | 2024 | $3,246,149 |
CONT_AWD_FA460024F0212_9700_FA890317D0020_9700 REPLACE FIRE PROTECTION SYSTEMS - B507 AT OFFUTT AFB, NE | Department of Defense Department of the Air Force | — | OFFUTT AFB, NE-01 | 2024 | $3,053,025 |
CONT_AWD_FA805122F0053_9700_FA890317D0020_9700 MCCONNELL AFB AMRS | Department of Defense Department of the Air Force | — | MCCONNELL AFB, KS-04 | 2024 | $2,794,518 |
CONT_AWD_FA805124F0049_9700_FA890317D0032_9700 MACDILL AFB FL AMRS PROJECT | Department of Defense Department of the Air Force | — | TAMPA, FL-14 | 2024 | $2,637,146 |
CONT_AWD_FA805122F0058_9700_FA890317D0020_9700 DYESS AFB ADVANCED METER READING SYSTEM (AMRS) | Department of Defense Department of the Air Force | — | DYESS AFB, TX-19 | 2024 | $1,607,014 |
CONT_AWD_FA805121F0043_9700_FA890317D0020_9700 SHAW AFB ADVANCED METER READING SYSTEM (AMRS) | Department of Defense Department of the Air Force | — | SHAW AFB, SC-05 | 2024 | $1,412,467 |
CONT_AWD_FA460024F0213_9700_FA890317D0020_9700 REPAIR FIRE PROTECTION SYSTEMS AND ALARMS - B517 AT OFFUTT AFB, NE | Department of Defense Department of the Air Force | — | OFFUTT AFB, NE-01 | 2024 | $1,177,500 |
CONT_AWD_FA303024F0043_9700_FA890317D0020_9700 REPAIR ROADS VALIANT AND CANBERRA. TOTAL PERIOD OF PERFORMANCE IS 225 CALENDAR DAYS FROM ISSUANCE OF NOTICE TO PROCEED. CLIN 0001: NINETY (90) CALENDAR DAYS. CLIN 0002: NINETY (90… | Department of Defense Department of the Air Force | — | GOODFELLOW AFB, TX-11 | 2024 | $1,022,512 |
CONT_AWD_FA301624F0315_9700_FA890317D0020_9700 RECURRING RUBBER REMOVAL JBSA-WIDE LOCALITIES INCLUDING RANDOLPH AIR FORCE BASE EAST RUNWAY, SEGUIN AUXILIARY FIELD, AND LACKLAND AIR FORCE BASE KELLY FIELD; PERIOD OF PERFORMANCE… | Department of Defense Department of the Air Force | — | RANDOLPH AFB, TX-28 | 2024 | $971,664 |
CONT_AWD_FA303023F0081_9700_FA890317D0020_9700 REPAIR APACHE TRAIL - GOODFELLOW AFB | Department of Defense Department of the Air Force | — | GOODFELLOW AFB, TX-11 | 2024 | $737,684 |
CONT_AWD_FA890323F0140_9700_FA890317D0020_9700 DESIGN AND CONSTRUCTION FOR SECURITY FENCE AROUND MAIN RAMP AT EBBING FIELD, FT SMITH, AR. | Department of Defense Department of the Air Force | — | FORT SMITH, AR-03 | 2024 | $700,934 |
CONT_IDV_FA890317D0010_9700 FFP, REGIONAL ENGINEERING AND CONSTRUCTION WEST | Department of Defense Department of the Air Force | — | — | 2024 | $0 |
CONT_IDV_FA890317D0020_9700 EO14042 - REGIONAL ENGINEERING AND CONSTRUCTION CENTRAL REGION | Department of Defense Department of the Air Force | — | — | 2024 | $0 |
CONT_IDV_FA890317D0032_9700 EO14042 - REGIONAL ENGINEERING AND CONSTRUCTION EAST REGION | Department of Defense Department of the Air Force | — | — | 2024 | $0 |
Top 29 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Funding Agencies
View All→Source: USAspending.gov · All Recipients · Mississippi