HDR ENVIRONMENTAL, OPERATIONS AND CONSTRUCTION, INC.
ENGLEWOOD, Colorado
Total Received
$274.8M
Total Awards
157
State
Colorado
Last Updated
Mar 16, 2026
Yearly Funding Trend
$191.0M24
$81.1M25
$2.7M26
Top 50 Awards to HDR ENVIRONMENTAL, OPERATIONS AND CONSTRUCTION, INC.
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through March 16, 2026.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_N6274224F0180_9700_N6247020D0016_9700 THIS CONTRACT TASK ORDER (CTO) MODIFICATION IS ISSUED TO EXERCISE THE FOLLOWING TASKS: TASK 5 - (EXERCISED 4 TIMES)TASK 11- (EXERCISED 8 TIMES)TASK 12 - (EXERCISED 7 TIMES)TASK 1… | Department of Defense Department of the Navy | — | PEARL HARBOR, HI-01 | 2024 | $22,572,693 |
CONT_AWD_W9127822F0418_9700_W9127820D0045_9700 THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE STATEMENT OF WORK AND STATEMENT OF REVISIONS. | Department of Defense Department of the Army | — | OCEANSIDE, CA-49 | 2024 | $21,527,333 |
CONT_AWD_FA890322F0160_9700_FA890321D0007_9700 ARCHITECT-ENGINEERING (A-E) SERVICES TO SUPPORT FACILITIES ENGINEERING FOR DEFENSE LOGISTICS AGENCY DISTRIBUTION WORLDWIDE | Department of Defense Department of the Air Force | — | SUSQUEHANNA, PA-09 | 2025 | $13,517,174 |
CONT_AWD_FA890324F0083_9700_FA890321D0007_9700 THE WORK TO BE PERFORMED WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW), SET FORTH AS ATTACHMENT 1 ENTITLED MASTER PLANNING AND ENGINEERING DESIGN FOR MULTIPLE DLA LOCATIO… | Department of Defense Department of the Air Force | — | COLUMBUS, OH-03 | 2024 | $12,187,281 |
CONT_AWD_FA890321F0137_9700_FA890321D0007_9700 ARCHITECT -ENGINEERING SERVICES TO SUPPORT FACILITIES ENGINEERING AND PLANNING ASSISTANCE FOR DLA DISTRIBUTION WORLDWIDE THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REVIS… | Department of Defense Department of the Air Force | — | JBSA LACKLAND, TX-23 | 2025 | $8,195,464 |
CONT_AWD_FA890324F0018_9700_FA890321D0007_9700 THE CONTRACTOR SHALL PROVIDE DESIGN REVIEWS, TITLE II AND OTHER AE SERVICES ON REQUIREMENTS DRIVEN TO SUPPORT THE AIR FORCE CIVIL ENGINEER CENTER (AFCEC) FOR VARIOUS MILCON (MILIT… | Department of Defense Department of the Air Force | — | ENGLEWOOD, CO-04 | 2024 | $7,249,518 |
CONT_AWD_W9127824F0334_9700_W9127820D0045_9700 THE PURPOSE OF THIS TASK ORDER IS FOR THE REAL PROPERTY MANAGEMENT & ENVIRONMENTAL PLANNING SUPPORT FOR THE U.S. MARINE CORPS FORCES RESERVE (MARFORRES) NEW ORLEANS, LA. | Department of Defense Department of the Army | — | ARABI, LA-02 | 2024 | $6,906,703 |
CONT_AWD_W9127823F0313_9700_W9127820D0045_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 28 AUG 2025. | Department of Defense Department of the Army | — | NEW ORLEANS, LA-02 | 2025 | $6,667,891 |
CONT_AWD_W9127825F0156_9700_W9127820D0045_9700 THE PURPOSE OF THIS TASK ORDER IS TO AWARD BUILDER SMS IMCOM CONUS, EUROPE AND HONDURAS. | Department of Defense Department of the Army | — | MOBILE, AL-02 | 2025 | $5,790,799 |
CONT_AWD_HSFE4014F0208_7022_GS10F0073L_4730 DE-OBLIGATION EXCESS FUNDS | Department of Homeland Security Federal Emergency Management Agency | — | WASHINGTON, DC-98 | 2024 | $5,163,199 |
CONT_AWD_70FA4020F00000068_7022_GS10F0073L_4730 THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR 4 OF THIS TASK ORDER AS REQUESTED WITH PR WX03843Y2024T. THE PERIOD OF PERFORMANCE FOR OPTION YEAR 4 IS 09-JUN-2024 TH… | Department of Homeland Security Federal Emergency Management Agency | — | WASHINGTON, DC-98 | 2024 | $5,134,892 |
CONT_AWD_FA890325F0174_9700_FA890321D0007_9700 A-E SERVICES TO SUPPORT FACILITIES ENGINEERING FOR DLA WORLDWIDE- CONTRACT FA8903-21-D-0007 FA8903-25-F-0174 | Department of Defense Department of the Air Force | — | ENGLEWOOD, CO-04 | 2025 | $4,995,000 |
CONT_AWD_W912BV21F0002_9700_W912BV19D0016_9700 ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR THE ESTABLISHMENT OF LONG-RANGE OVERLAND FLIGHT CORRIDORS TERMINATING AT WHITE SANDS MISSILE RANGE (WSMR)- MODIFICATION P00003 EXTENDS THE… | Department of Defense Department of the Army | — | WHITE SANDS MISSILE RANGE, NM-02 | 2025 | $4,912,636 |
CONT_AWD_FA890322F0146_9700_FA890321D0007_9700 ARCHITECT-ENGINEERING (A-E) SERVICES TO SUPPORT ENERGY RESOURCES MANAGEMENT PROGRAM SUPPORT FOR DEFENSE LOGISTICS AGENCY DISTRIBUTION WORLDWIDE | Department of Defense Department of the Air Force | — | ANNISTON, AL-03 | 2024 | $4,865,158 |
CONT_AWD_W9127825FA174_9700_W9127825D0002_9700 FY25 REAL PROPERTY MANAGEMENT AND ENVIRONMENTAL PLANNING SUPPORT FOR MARFORRES, NEW ORLEANS, LA | Department of Defense Department of the Army | — | NEW ORLEANS, LA-02 | 2025 | $4,628,440 |
CONT_AWD_W9127821F0433_9700_W9127820D0045_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR REAL PROPERTY MANAGEMENT & ENVIRONMENTAL PLANNING SUPPORT FOR U.S. MARINE CORPS FORCES RESERVE NEW ORLE… | Department of Defense Department of the Army | — | NEW ORLEANS, LA-02 | 2024 | $4,536,497 |
CONT_AWD_W9127823F0178_9700_W9127820D0045_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 21 MAY 2026. | Department of Defense Department of the Army | — | MOBILE, AL-01 | 2024 | $4,389,938 |
CONT_AWD_FA890320F1138_9700_FA890315D0007_9700 DLA FACILITIES ENGINEERING AND PLANNING SUPPORT | Department of Defense Department of the Air Force | — | TINKER AFB, OK-04 | 2024 | $4,168,023 |
CONT_AWD_N6247023F4054_9700_N6247020D0016_9700 THIS MODIFICATION ADDS AN ADDITIONAL FIELD SEASON IN 2025 AND EXTENDS THE PERIOD OF PERFORMANCE TO 30 JUNE 2026. | Department of Defense Department of the Navy | — | HATTERAS, NC-03 | 2024 | $4,023,350 |
CONT_AWD_W9127820F0002_9700_FA890315D0007_9700 MODIFICATION TO DE-OB & CLOSEOUT | Department of Defense Department of the Army | — | TYNDALL AFB, FL-02 | 2025 | $3,940,426 |
CONT_AWD_W9127823F0076_9700_W9127821D0054_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION 2002, FUND SUPPLEMENTAL WORK WITHIN SCOPE AND TO CORRECT THE CLIN STRUCTURE FOR THE PREVIOUS MODIFICATION. | Department of Defense Department of the Army | — | ENGLEWOOD, CO-04 | 2024 | $3,810,750 |
CONT_AWD_N6274223F0112_9700_N6247020D0016_9700 P-209 DD3 REPLACEMENT MARINE MITIGATION ACTIONS, JBPHH - MOD 10: PROCUREMENT AND INSTALLATION OF (NON-MODULE) HABITAT STABILIZATION | Department of Defense Department of the Navy | — | PEARL HARBOR, HI-01 | 2024 | $3,713,289 |
CONT_AWD_W9127824F0165_9700_W9127820D0045_9700 THE PURPOSE OF THIS MODIFICATION IS TO ADD ADDITIONAL SQUARE FEET TO BE ASSESSED FOR THE SMS BUILDER ASSESSMENTS FOR SUSTAINMENT FOR USARC AT 81ST READINESS DIVISION & FT. BUCHANA… | Department of Defense Department of the Army | — | FORT BUCHANAN, PR-98 | 2024 | $3,322,676 |
CONT_AWD_W9127824F0034_9700_W9127823D0018_9700 MOBILE HARBOR CMS EXERCISE OPTION YEAR 1 | Department of Defense Department of the Army | — | MOBILE, AL-02 | 2024 | $3,041,635 |
CONT_AWD_W9127825F0111_9700_W9127820D0045_9700 THE PURPOSE OF THIS TASK ORDER IS FOR FY25 USARC BUILDER ASSESSMENTS AT VARIOUS CONUS LOCATIONS IN THE NORTHEASTERN UNITED STATES. | Department of Defense Department of the Army | — | FORT DIX, NJ-03 | 2025 | $3,036,832 |
CONT_AWD_FA890325F0044_9700_FA890321D0021_9700 POOL 1 AIRFIELD INFRASTRUCTURE TITLE II ARCHITECT-ENGINEERING SERVICES FOR DESIGN-BUILD CONSTRUCTION OF REPAIR RUNWAY 15C/33C AND OVERRUNS 15R/33L AT SHEPPARD AFB, TX PROJECT NUMB… | Department of Defense Department of the Air Force | — | SHEPPARD AFB, TX-13 | 2025 | $2,929,911 |
CONT_AWD_140M0118F0006_1435_INM15PC00002_1435 RODEO TASK 9-FIELD OBS MET TOWER INSTALL | Department of the Interior Bureau of Ocean Energy Management | — | ENGLEWOOD, CO-04 | 2026 | $2,720,960 |
CONT_AWD_N4008522F5554_9700_N6247020D0016_9700 NO COST PERIOD OF PERFORMANCE EXTENSION. | Department of Defense Department of the Navy | — | NORFOLK, VA-03 | 2024 | $2,694,269 |
CONT_AWD_W9127822F0344_9700_W9127821D0054_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION YEAR 2 FOR TASK ORDER W9127822F0344 ENVIRONMENTAL COMPLIANCE AND ENGINEERING TECHNICAL SUPPORT REOCCURRING FOR U.S. MARINE C… | Department of Defense Department of the Army | — | NEW ORLEANS, LA-02 | 2024 | $2,654,861 |
CONT_AWD_W9127822F0472_9700_W9127820D0045_9700 THE PURPOSE OF THIS MODIFICATION IS TO ADD NO ADDITIONAL COST WORK AND EXTEND PERIOD OF PERFORMANCE FROM 28 JUNE 2025 TO 28 DECEMBER 2025. | Department of Defense Department of the Army | — | NORTH CHESTERFIELD, VA-04 | 2024 | $2,617,626 |
CONT_AWD_N6247023F4020_9700_N6247020D0016_9700 MODIFICATION TO ADD TASK WORK AND EXTEND THE PERIOD OF PERFORMANCE TO DECEMBER 31,2026. | Department of Defense Department of the Navy | — | AURORA, CO-06 | 2024 | $2,474,034 |
CONT_AWD_FA301623F0563_9700_FA890321D0021_9700 THIS TASK ORDER (TO) ON THE AE NEXT CONTRACTING VEHICLE IS FOR THE FSRM CTO PROJECT REPAIR WEST RUNWAY, TYMX206613, AT JOINT BASE SAN ANTONIO - RANDOLPH. THE WORK INCLUDES A 100%… | Department of Defense Department of the Air Force | — | RANDOLPH AFB, TX-28 | 2025 | $2,409,535 |
CONT_AWD_140M0122F0030_1435_140M0121D0003_1435 MODIFICATION P00007 PROVIDES A NO-COST EXTENSION TO ALLOW COMPLETION OF IN-SCOPE MONITORING AND REPORTING ACTIVITIES AND DEOBLIGATES EXCESS FUNDS FROM COMPLETED TASKS THAT ARE NO… | Department of the Interior Bureau of Ocean Energy Management | — | NEW BEDFORD, MA-09 | 2024 | $2,243,851 |
CONT_AWD_W911KB24F0119_9700_47QRAA22D00AR_4732 GSA TASK ORDER FOR EQCP1030 (FY24)-AFQ042 SAIPAN ENVIRONMENT ASSESSMENT FOR LARGE SCAL FIGHTER EXERCISES, SAIPAN | Department of Defense Department of the Army | — | ENGLEWOOD, CO-04 | 2024 | $2,187,535 |
CONT_AWD_FA890322F0081_9700_FA890321D0021_9700 ARCHITECTURE/ENGINEERING TITLE I SERVICES REPAIR ALPHA APRON, TAXIWAYS ALPHA BRAVO CHARLIE DELTA ECHO& WARM UP PAD FAC 5010 5005 11301 WAKE ISLAND | Department of Defense Department of the Air Force | — | WAKE ISLAND, HI-99 | 2024 | $2,122,504 |
CONT_AWD_W912BV20F0096_9700_W912BV19D0016_9700 REMEDIAL DESIGN, LONGHORN ARMY AMMUNITION PLANT AT KARNACK, TEXAS. MOD DE-OBLIGATION OF UNUSED FUNDS. | Department of Defense Department of the Army | — | KARNACK, TX-01 | 2024 | $2,064,420 |
CONT_AWD_W911KB23F0125_9700_47QRAA22D00AR_4732 GSA TASK ORDER FOR EIS FOR NORTHSIDE FACILITIES AT ANDERSEN AFB - WITHIN-SCOPE MODIFICATION FOR ADDITIONAL WORK | Department of Defense Department of the Army | — | ENGLEWOOD, CO-04 | 2024 | $2,052,969 |
CONT_AWD_N4008524F5473_9700_N6247020D0016_9700 SEDIMENT SAMPLING AND JPA TO SUPPORT OCEAN AND UPLAND DISPOSAL OF | Department of Defense Department of the Navy | — | NORFOLK, VA-03 | 2024 | $2,050,262 |
CONT_AWD_W9127823F0249_9700_W9127823D0018_9700 EXERCISE OPTION YEAR 2 CLIN 0003 | Department of Defense Department of the Army | — | PANAMA CITY, FL-02 | 2024 | $2,035,419 |
CONT_AWD_FA489722F0047_9700_FA890321D0007_9700 RSAF PLUSUP. MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE TO 31 JANUARY 2024. | Department of Defense Department of the Air Force | — | MOUNTAIN HOME AFB, ID-02 | 2024 | $1,996,729 |
CONT_AWD_W911KB19F0136_9700_FA890316D0031_9700 A1030 (FY19)-ANDERSON AFB EIS | Department of Defense Department of the Army | — | ENGLEWOOD, CO-04 | 2024 | $1,882,331 |
CONT_AWD_W9127821F0453_9700_W9127821D0054_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 30 SEP 2026. | Department of Defense Department of the Army | — | EL SEGUNDO, CA-36 | 2025 | $1,818,235 |
CONT_AWD_W9127822F0208_9700_W9127820D0024_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTION 0003 FY25 ENVIRONMENTAL RESTORATION SUPPORT FOR DEFENSE DEPOT MEMPHIS, TN (DDMT). | Department of Defense Department of the Army | — | MEMPHIS, TN-09 | 2024 | $1,804,376 |
CONT_AWD_W9127822F0377_9700_W9127821D0054_9700 THE PURPOSE OF THIS MOD IS TO EXTEND THE PERIOD OF PERFORMANCE TO 1-JUN-2026 | Department of Defense Department of the Army | — | NEW CUMBERLAND, PA-10 | 2024 | $1,803,908 |
CONT_AWD_W9127822F0098_9700_W9127820D0045_9700 DLA DISTRIBUTION MODERNIZATION PLAN(DMP) MODIFICATION TO DE-OBLIGATE AND CLOSE OUT CONTRACT. | Department of Defense Department of the Army | — | ENGLEWOOD, CO-04 | 2025 | $1,799,316 |
CONT_AWD_W9127825F0154_9700_W9127820D0045_9700 TASK ORDER FOR FY25 BUILDER IMCOM, FT. STEWART, GA | Department of Defense Department of the Army | — | HINESVILLE, GA-01 | 2025 | $1,719,140 |
CONT_AWD_W9127823F0062_9700_W9127821D0054_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 30 SEPTEMBER 2025 FOR ENVIRONMENTAL COMPLIANCE SUPPORT FOR USMC NEW ORLEANS. | Department of Defense Department of the Army | — | ENGLEWOOD, CO-04 | 2024 | $1,698,028 |
CONT_AWD_N6247024F4015_9700_N6247020D0016_9700 MONITORING PROGRAM MANAGEMENT, ANALYSIS, AND REPORTING MODIFICATION TO ADD SCOPE, FUNDING, AND EXTEND THE PERIOD OF PERFORMANCE | Department of Defense Department of the Navy | — | ENGLEWOOD, CO-04 | 2024 | $1,575,362 |
CONT_AWD_W9127825FA260_9700_W9127825DA005_9700 FY25 SUSTAINABILITY FOR THE 81ST READINESS DIVISION, MULTIPLE 81ST RD INSTALLATIONS | Department of Defense Department of the Army | — | MOBILE, AL-02 | 2025 | $1,527,907 |
CONT_AWD_W9127824F0347_9700_W9127820D0045_9700 FY24 EIS CONSOLIDATED THIRD F-35A EA FOR THE FORMAL TRAINING UNIT BEDDOWN AT EGLIN AIR FORCE BASE, FLORIDA. | Department of Defense Department of the Army | — | EGLIN AFB, FL-01 | 2024 | $1,491,873 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Industries
View All→123456789
ENGINEERING SERVICES$190.4M
OTHER SCIENTIFIC AND TECHNICAL CONSULTING SERVICES$58.4M
ENVIRONMENTAL CONSULTING SERVICES$15.2M
REMEDIATION SERVICES$5.8M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)$2.7M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)$2.2M
FACILITIES SUPPORT SERVICES$23K
SOLID WASTE COLLECTION$20K
LANDSCAPE ARCHITECTURAL SERVICES$3K
Source: USAspending.gov · All Recipients · Colorado