JLL-RER SOLUTIONS, LLC
WASHINGTON, Virginia
Total Received
$87.6M
Total Awards
94
State
Virginia
Last Updated
Feb 17, 2026
Yearly Funding Trend
$65.7M24
$21.9M25
Top 50 Awards to JLL-RER SOLUTIONS, LLC
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through February 17, 2026.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_W9124J24F0181_9700_W9124J23D0016_9700 PRIMARY HOUSING INSPECTIONS (CONUS) | Department of Defense Department of the Army | — | WASHINGTON, DC-98 | 2024 | $29,212,084 |
CONT_AWD_W9124J23F0186_9700_W9124J23D0016_9700 PRIIMARY AND FCA HOUSING INSPECTIONS | Department of Defense Department of the Army | — | WASHINGTON, DC-98 | 2024 | $21,018,372 |
CONT_AWD_W9124J25FA094_9700_W9124J23D0016_9700 ARMY PRIVATIZED HOUSING INSPECTION SERVICES CONTRACT | Department of Defense Department of the Army | — | WASHINGTON, DC-98 | 2025 | $13,907,991 |
CONT_AWD_W9124J25FA143_9700_W9124J23D0016_9700 PERFORMANCE WORK STATEMENT (PWS) ARMY PRIVATIZED HOUSING INSPECTION SERVICES CONTRACT THIS IS A NON-PERSONAL SERVICES CONTRACT TO PROVIDE ARMY PRIVATIZED AND GOVERNMENT-OWNED MILI… | Department of Defense Department of the Army | — | WASHINGTON, DC-98 | 2025 | $7,293,845 |
CONT_AWD_47PF0022F0949_4740_47PF0022A0010_4740 MODIFICATION TO EXERCISE 3-MONTH EXTENSION OF CONSOLIDATED FACILITIES MANAGEMENT SERVICES AT 4 LOCATIONS IN MINNESOTA. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $6,181,106 |
CONT_AWD_W9124J23F0173_9700_W9124J23D0016_9700 PROGRAM MANAGEMENT COSTS | Department of Defense Department of the Army | — | WASHINGTON, DC-98 | 2024 | $4,448,814 |
CONT_AWD_W9124J23F0175_9700_W9124J23D0016_9700 FORT STEWART | Department of Defense Department of the Army | — | WASHINGTON, DC-98 | 2024 | $3,658,391 |
CONT_AWD_83310123F0058_8300_47QSHA21D002D_4732 MILESTONES CHANGED | Export-Import Bank of the United States Export-Import Bank of the United States | — | WASHINGTON, DC-98 | 2025 | $300,000 |
CONT_AWD_83310121P0021_8300_-NONE-_-NONE- MOD TO SHORTEN POP AND DEOBLIGATION OF UNUSED FUNDS FOR CLOSEOUT. | Export-Import Bank of the United States Export-Import Bank of the United States | — | HERNDON, VA-11 | 2024 | $95,954 |
CONT_AWD_47PF0025F0111_4740_47PF0022A0010_4740 TO REPLACE 3 SEWER EJECTOR PUMPS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $66,901 |
CONT_AWD_47PF0024F0015_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPAIR 21 PACKAGED TERMINAL AIR CONDITIONER (PTAC) WALL UNITS AT THE EDWARD J. DEVITT U.S. COURTHOUSE AND FEDERAL BU… | General Services Administration Public Buildings Service | — | FERGUS FALLS, MN-07 | 2024 | $47,889 |
CONT_AWD_47PF0024F0391_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE THE CAFETERIA FREEZER AND TILTING KETTLE AT THE DIANA E. MURPHY U.S. COURHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $47,633 |
CONT_AWD_47PF0024F0947_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE CONTROLLERS FOR AIR HANDLING UNIT 3-1, 3-2, & 8-1 AT THE BURGER FEDERAL BUILDING AND U.S. COURTHOUSE IN ST.… | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $46,872 |
CONT_AWD_47PF0024F0430_4740_47PF0022A0010_4740 MODIFICATION TO ADD FUNDS FOR ADDITIONAL OVERTIME SERVICES TO EXPEDITE THE REPAIR OF THE CHILLED WATER AIR SEPARATOR AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $46,304 |
CONT_AWD_47PF0023F1028_4740_47PF0022A0010_4740 ADDING OVERTIME HOURS AND ELECTRICAL WORK TO CLIN001 FOR THE INSTALLATION OF BUTTERFLY VALVES ON THE SPRINKLER SYSTEM FOR THE DIANA E. MURPHY COURTHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $45,301 |
CONT_AWD_47PF0023F0668_4740_47PF0022A0010_4740 DEOBLIGATION OF RESIDUAL FUNDS, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $43,690 |
CONT_AWD_47PF0024F0534_4740_47PF0022A0010_4740 THE MOTHERING ROOM BUILD OUT WILL BE PERFORMED AT THE DIANA E. MURPHY US COURTHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $43,451 |
CONT_AWD_47PF0024F0850_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPAIR HEAT EXCHANGERS AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $42,812 |
CONT_AWD_47PF0024F0283_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REMOVE AND REPLACE CONDENSATE RECEIVER AND INSTALL FIVE NEW ACCESS PANELS IN RESTROOM CEILING TO ACCESS SHUT OFF VAL… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $41,871 |
CONT_AWD_47PF0024F0434_4740_47PF0022A0010_4740 INSPECT SEWAGE EJECTOR PUMPS, INSPECT AND INVESTIGATE LEAKING STEAM COIL UNIT FOR AIR HANDLING UNIT AND REPAIR DAMAGED ROBING ROOM DOORS AT THE DIANA E. MURPHY U.S. COURTHOUSE IN… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $41,619 |
CONT_AWD_47PF0025F0338_4740_47PF0022A0010_4740 TO REPLACE 80 GAUGES, COMPLETE THE 5 YEAR OBSTRUCTION TEST, AND REPLACE A CHILLED WATER PUMP MOTOR AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $41,430 |
CONT_AWD_47PF0024F0426_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO FURNISH AND INSTALL 1600-AMP TRIP UNIT AND REPLACE DOMESTIC HOT WATER AIR SEPARATORS AT THE DIANA E. MURPHY COURTHOU… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $40,987 |
CONT_AWD_47PF0024F0857_4740_47PF0022A0010_4740 REMOVE, REBUILD AND RETROFIT EIGHT HUMIDIFICATION UNITS FOR BUILDING AIR HANDLER UNITS - HUMIDIFICATION UNITS RETROFITTED - BURGER FEDERAL BUILDING AND UNITED STATES COURTHOUSE -… | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $40,336 |
CONT_AWD_47PF0024F0468_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO INSTALL CHEMICAL PUMP FOR BUILDING LOOPS AT THE DINANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $38,661 |
CONT_AWD_47PF0025F0457_4740_47PF0022A0010_4740 TO REPLACE CONTROLLER AND LOCKS, REPAIR SPRINKLER PIPE AND DOOR, INSTALL SAFETY FILMS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $37,983 |
CONT_AWD_47PF0025F0143_4740_47PF0022A0010_4740 HEAT EXCHANGER HEAD REPLACEMENT, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $33,906 |
CONT_AWD_47PF0023F0685_4740_47PF0022A0010_4740 DEOBLIGATION MODIFICATION TO REMOVE EXCESS FUNDS. | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $33,707 |
CONT_AWD_47PF0024F1002_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO RELOCATE STEAM TRAP, PROGRAM ELEVATOR RELAY MODULE, INSTALL MIXING VALVES, REPAIR FIRE/LIFE SAFETY DEFICINCIES, & RE… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $32,046 |
CONT_AWD_47PF0025F0532_4740_47PF0022A0010_4740 REFRESH MAINTENANCE OFFICE 3RD FLOOR PROJECT, MURPHY COURTHOUSE, MINNEAPOLIS, MN. INSTALL GYPSUM BOARD WALLS WITH HOLLOW METAL DOORS, INFILL EXISTING OPENING, PAINT WALLS, DOORS,… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $31,772 |
CONT_AWD_47PF0024F0913_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE STEAM COILS AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $30,827 |
CONT_AWD_47PF0025F0165_4740_47PF0022A0010_4740 PARKING RAMP CLEANOUT REPLACEMENT AND LOBBY FLOOR DRAIN PIPING AND VALVE REPAIR AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $29,433 |
CONT_AWD_47PF0023F0985_4740_47PF0022A0010_4740 DEOBLIGATION OF EXCESS FUNDS FOR CLOSEOUT OF ORDER 47PF0023F0985 AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $26,696 |
CONT_AWD_47PF0025F0341_4740_47PF0022A0010_4740 THE EMERGENCY POWER TRACE & CIRCUIT MAPPING WILL BE PERFORMED AT THE DIANA E. MURPHY U.S. COURTHOUSE AT 300 S. 4TH STREET, SUITE 1012, MINNEAPOLIS, MN 55415. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $24,156 |
CONT_AWD_47PF0024F0847_4740_47PF0022A0010_4740 INCREASE FUNDING AND EXTEND THE PERIOD OF PERFORMANCE, REPLACE HEAT PUMP, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $22,869 |
CONT_AWD_47PF0024F0089_4740_47PF0022A0010_4740 CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, TOOLS, MATERIALS AND SUPERVISION TO REPLACE FAILED SUPPLY FAN IN LOWER LEVEL OF PARKING RAMP AT THE DIANA E. MURPHY U.S. COURTHOUSE… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $20,271 |
CONT_AWD_47PF0025F0340_4740_47PF0022A0010_4740 REPAIR PIPE LEAK FOR HEAT EXCHANGERS 1 AND 2 AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $18,247 |
CONT_AWD_47PF0024F0328_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO INSTALL CAFE ESPRESSO MACHINE IN NEW LOCATION AND, REPAIR THE MAIN CONDENSATE RECEIVER AT THE DIANA E. MURPHY U.S. C… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $18,158 |
CONT_AWD_47PF0024F0671_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO PERFORM PREVENTATIVE WATER FLUSHING, INCLUDING COMMON SOURCE LOCATIONS, RISERS, SHOWERS AND DRINKING WATER OUTLETS A… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $17,514 |
CONT_AWD_47PF0024F0343_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE FAILED B1 STAIRWELL HEATER REPAIR 9E COURTROOM DOOR, AND REPLACE FLS POWER SUPPLIES AT THE DIANA E. MURPHY U… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $16,762 |
CONT_AWD_47PF0023F0814_4740_47PF0022A0010_4740 MODIFICATION TO CHANGE THE COMPLETION DATE FOR CLIN 0001-BURGER VARIABLE AIR VOLUME (VAV) CONTROLLER REPAIR. CHANGE COMPLETION DATE FROM 11/20/2023 TO 12/29/2023.WORK BEING PERFOR… | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $16,448 |
CONT_AWD_47PF0024F0906_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REMOVE EXISTING GLASS DOOR AND REINSTALL EXISTING PANIC AND FLOOR CLOSER ON NEW DOOR AT THE MURPHY U.S. COURTHOUSE I… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $16,166 |
CONT_AWD_47PF0024F0479_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE LEAKING SPRINKLER LINES OUTSIDE OF FIRE PUMP ROOM IDENTIFIED ON INITIAL DEFICINECY LIST FOR THE DIANA E. MUR… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $15,729 |
CONT_AWD_47PF0024F0558_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPLACE LOCKS CYLINDERS THROUGHOUT THE BUILDING, AND ESTABLISH A MASTER AND GRAND MASTER KEY SYSTEM AT THE EDWARD J.… | General Services Administration Public Buildings Service | — | FERGUS FALLS, MN-07 | 2024 | $14,250 |
CONT_AWD_47PF0024F0874_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REMOVE AND DISPOSE OF DAMAGED CARPET IN PEDWAY TUNNEL AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $14,000 |
CONT_AWD_47PF0025F0634_4740_47PF0022A0010_4740 TO PURCHASE ANALOG TIME CLOCKS, REPAIR THE STEAM LEAK AND REKEY THE DOORS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS. | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2025 | $13,998 |
CONT_AWD_47PF0024F0212_4740_47PF0022A0010_4740 CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, TOOLS, MATERIALS, AND SUPERVISION RETROFIT COURTROOM CLOCK MOTORS/MOVEMENTS AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, M… | General Services Administration Public Buildings Service | — | MINNEAPOLIS, MN-05 | 2024 | $13,811 |
CONT_AWD_47PF0024F0427_4740_47PF0022A0010_4740 MODIFICATION TO DEOBLIGATE EXCESS FUNDS ON THE ORDER FOR RE-KEYING AT THE BURGER U.S. COURTHOUSE, ST. PAUL, MN | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $13,528 |
CONT_AWD_47PF0024F0341_4740_47PF0022A0010_4740 FIRST FLOOR ASBESTOS REMOVAL PROJECT, EDWARD J. DEVITT U. S. COURTHOUSE & FEDERAL BUILDING, FERGUS FALLS, MN. INCREASE COST TO REPLACE ORIGINAL SUBCONTRACTOR THAT IS UNABLE TO PE… | General Services Administration Public Buildings Service | — | FERGUS FALLS, MN-07 | 2024 | $13,521 |
CONT_AWD_47PF0024F0379_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REPAIR PARKING LOT SINKHOLE, ADD DIAMOND PLATING TO PILLARS AND PERFORM INTERIOR/EXTERIOR PAINTING AT THE W E BURGER… | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $11,426 |
CONT_AWD_47PF0024F0738_4740_47PF0022A0010_4740 CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO INSTALL ONE AIR HANDLER UNIT (AHU) AT THE W E BURGER FEDERAL BUILDING AND U.S. COURTHOUSE IN ST. PAUL, MN. | General Services Administration Public Buildings Service | — | SAINT PAUL, MN-04 | 2024 | $11,206 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Source: USAspending.gov · All Recipients · Virginia