JACOBS ENGINEERING GROUP INC.
ARLINGTON, Virginia
Total Received
$302.5M
Total Awards
199
State
Virginia
Last Updated
Apr 10, 2026
Yearly Funding Trend
$206.5M24
$56.8M25
$39.3M26
Top 50 Awards to JACOBS ENGINEERING GROUP INC.
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through April 10, 2026.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_697DCK19F00179_6920_697DCK19D00002_6920 CANCEL OF SEATTLE, WA (SEA) ATCT AND BASE BUILDING PARTIAL ROOF REPLACEMENT PER CP D24-054A | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $23,303,799 |
CONT_AWD_W9123822C0011_9700_-NONE-_-NONE- OPTION YEAR THREE (3) HILL AFB, BASE INTEGRATED ENVIRONMENTAL SUPPORT TASKS (BIEST) | Department of Defense Department of the Army | — | LAYTON, UT-01 | 2024 | $22,758,173 |
CONT_AWD_697DCK21F00755_6920_697DCK19D00002_6920 ZUA MAJOR MECHANICAL DESIGN SEPARATION PER CP D31-027B & ZUA EW, ZID & ZAB CRMA RECONCILIATIONS PER CP D31-026 | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $15,913,894 |
CONT_AWD_697DCK26F00051_6920_697DCK19D00002_6920 ARTCC CONSOLIDATION PROTOTYPE TO INCLUDE TRACONS AND REMOTE TOWERS PER CP D40-001 | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2026 | $15,718,093 |
CONT_AWD_W912DR18F0460_9700_W912DR16D0009_9700 EXERCISE OPTION LINS 0026AA, 0026AB &0028AA AND EXTEND POP TO 30 NOVEMBER 2026 | Department of Defense Department of the Army | — | AURORA, CO-06 | 2024 | $15,669,041 |
CONT_AWD_697DCK22F00729_6920_697DCK19D00002_6920 ZJX ARTCC, HILLIARD, FL UNDERGROUND UTILITIES REPLACEMENT PER CP D34-038C | Department of Transportation Federal Aviation Administration | — | NASHUA, NH-02 | 2024 | $13,583,502 |
CONT_AWD_697DCK20F00040_6920_697DCK19D00002_6920 FY 24 CONDITION ASSESSMENT (CA) AND LIFE CYCLE (LC) EVALUATIONS AT 28 NEW SITES AND 4 PREVIOUS SITES REMOVED PER CP D15-012A | Department of Transportation Federal Aviation Administration | — | ARLINGTON, VA-08 | 2024 | $12,008,911 |
CONT_AWD_68HE0525F0027_6800_68HE0523D0003_6800 SUPERFUND AND GREAT LAKES ARCHITECT-ENGINEER SERVICES (SFGLAES): MILWAUKEE ESTUARY REMEDIAL DESIGN MODIFICATION P00002 | Environmental Protection Agency Environmental Protection Agency | — | MILWAUKEE, WI-04 | 2026 | $9,644,224 |
CONT_AWD_W912PL23F0020_9700_W912PL22D0020_9700 OPTIONS 1002 SURFACE CLEARANCE AND 1003 AGC DATA COLLECTION | Department of Defense Department of the Army | — | SIMI VALLEY, CA-26 | 2025 | $8,096,814 |
CONT_AWD_697DCK20F00030_6920_697DCK19D00002_6920 ZLA, FMH, MD, ZHU, ZUA, ZJX, ZOA AND RU RECONCILIATIONS PER CP D29-011 | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $7,925,402 |
CONT_AWD_697DCK20F00043_6920_697DCK19D00002_6920 ATCT CAB GLAZING TORNADO IMPACT TESTING PER CP D23-050 | Department of Transportation Federal Aviation Administration | — | ARLINGTON, VA-08 | 2024 | $7,558,847 |
CONT_AWD_47PJ0025F0117_4740_47PD0224A0003_4740 CONSTRUCTION MANAGER AS AGENT AND COMMISSIONING AGENT SERVICES FOR THE ALCAN AK LPOE RENOVATION DB PROJECT LOCATED AT MILEPOST 1221.8 ON THE ALASKA HIGHWAY, IN TOK, AK 99780. | General Services Administration Public Buildings Service | — | TOK, AK-00 | 2025 | $7,268,198 |
CONT_AWD_FA231825FB016_9700_47QRAA21D00AF_4732 THE GLOBAL MOBILITY AND SPECIAL MISSIONS (GMSM) TASK ORDERS WILL PROVIDE SOFTWARE DEVELOPMENT SERVICES WITHIN AN AGILE FRAMEWORK FOR THE DELIVERY OF VARIOUS MISSION PLANNING (MP)… | Department of Defense Department of the Air Force | — | ARLINGTON, VA-08 | 2025 | $6,413,107 |
CONT_AWD_68HE0524F0037_6800_68HE0523D0003_6800 UNITY AUTO MART RI/FS (SFGLAES) | Environmental Protection Agency Environmental Protection Agency | — | UNITY, WI-07 | 2024 | $6,232,605 |
CONT_AWD_W9126G25FA007_9700_W912DQ21D4017_9700 A-E SERVICES REQUIRED FOR THE DBB (SITE ADAPT) OF THE DYESS FTD FACILITY IN ABILENE, TX. | Department of Defense Department of the Army | — | DYESS AFB, TX-19 | 2025 | $6,189,894 |
CONT_AWD_W912DR18F0027_9700_W912DR16D0009_9700 ECB-3/W912DR-16-D-0009/AE DEVELOPMENT OF D/B RFP REQUIREMENTS FOR ECB3. MODIFICATION TO RELEASE EXCESS FUNDS IN PREPARATION FOR CLOSING OUT THE TASK ORDER. | Department of Defense Department of the Army | — | FORT GEORGE G MEADE, MD-05 | 2024 | $6,163,453 |
CONT_AWD_697DCK20F00028_6920_697DCK19D00002_6920 ZKC ARTCC EXPANSION TANKS CONTROL ROOM REPLACEMENT PER CP D07-045 | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $5,863,249 |
CONT_AWD_697DCK23F00006_6920_697DCK19D00002_6920 KAHULUI (OGG) ATCT MODERNIZATION CA SUPPORT SERVICES PER CP D35-012 | Department of Transportation Federal Aviation Administration | — | KANSAS CITY, MO-05 | 2024 | $4,729,580 |
CONT_AWD_W9126G24F0385_9700_W912DQ21D4017_9700 DESIGN A SINGLE-STORY FLIGHT SIMULATOR FACILITY WITH A HIGH BAY SECTION FOR SIMULATOR EQUIPMENT AND AN ADJACENT SECOND STORY CONTROL ROOM AREA FOR DYESS AFB, TX. | Department of Defense Department of the Army | — | DYESS AFB, TX-19 | 2024 | $4,600,650 |
CONT_AWD_W912DY24F0226_9700_W912QR23D0045_9700 TO 100% DESIGN PACKAGE | Department of Defense Department of the Army | — | ARLINGTON, VA-08 | 2024 | $4,411,860 |
CONT_AWD_697DCK20F00044_6920_697DCK19D00002_6920 PROGRAM MANAGEMENT INCREMENTAL FUNDING (PR WA-26-00391) | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $4,106,959 |
CONT_AWD_47PD0224F0006_4740_47PF0023D0006_4740 HIS ADMINISTRATIVE MODIFICATION IS TO CORRECT THE PROJECT # LISTED ON FY2023 ACCOUNTING LINE 1 FROM VNY00060 TO VPA00060. | General Services Administration Public Buildings Service | — | ARLINGTON, VA-08 | 2024 | $4,051,726 |
CONT_AWD_697DCK20F00035_6920_697DCK19D00002_6920 ENROUTE PROGRAM MANAGEMENT INCREMENTAL FUNDING (PR WA-26-02401) | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $3,710,000 |
CONT_AWD_W9128F22F0130_9700_W912DQ21D4017_9700 POP EXTENSION TO 09 SEPTEMBER 2026 TO ALIGN WITH BOD FOR B-21 WEAPONS LOADER CONSTRUCTION PROJECT. | Department of Defense Department of the Army | — | ARLINGTON, VA-08 | 2025 | $3,363,420 |
CONT_AWD_W912WJ25F0003_9700_W912WJ24D0003_9700 HUMAN ENGINEERING LABORATORY DESIGN, NATICK SOLDIERS SYSTEMS CENTER, NATICK, MA | Department of Defense Department of the Army | — | NATICK, MA-05 | 2025 | $3,234,212 |
CONT_AWD_697DCK20F00051_6920_697DCK19D00002_6920 ANCHORAGE, AK ATCT TRACON ANC/A11 REPLACE COMMISSIONING SERVICES DESIGN PHASE (BASE) PER CP D14-012 | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $3,013,354 |
CONT_AWD_697DCK25F00003_6920_697DCK19D00002_6920 ZME UNDERGROUND UTILITIES AND PARKING LOT REPLACEMENT CA & QA SUPPORT SERVICES ULTRASONIC TESTING SUBCONSULTANT | Department of Transportation Federal Aviation Administration | — | NASHUA, NH-02 | 2026 | $2,896,870 |
CONT_AWD_05GA0A25K0126_0559_05GA0A21D0004_0559 THE PURPOSE OF THIS ORDER IS FOR THE ELECTRICAL VAULT UPGRADE AT THE GOVERNMENT ACCOUNTABILITY OFFICE HEADQUARTERS PERIOD OF PERFORMANCE SEPTEMBER 30, 2025 - AUGUST 29, 2026 | Government Accountability Office GAO, Except Comptroller General | — | ARLINGTON, VA-08 | 2025 | $2,895,091 |
CONT_AWD_W518EA22C0002_9700_-NONE-_-NONE- EL PASO VETERANS AFFAIRS NEW HEALTH CARE CENTER COMMISSIONING AGENT SERVICES FOR DESIGN BUILD RFP DEVELOPMENT | Department of Defense Department of the Army | — | FORT BLISS, TX-23 | 2024 | $2,781,244 |
CONT_AWD_68HE0525F0054_6800_68HE0523D0003_6800 TEN-MILE DRAIN SUPERFUND SITE (B5BP): REGION 5,(SFGLAES), SEMD, JACOBS (68HE0523D0003), REMEDIAL DESIGN (RD) TASK ORDER THE PURPOSE OF THIS MODIFICATION: 1) FUND $591,986.25 TO EX… | Environmental Protection Agency Environmental Protection Agency | — | SAINT CLAIR SHORES, MI-10 | 2026 | $2,768,210 |
CONT_AWD_80KSC025FA036_8000_80KSC022DA122_8000 SOUTHEAST REGINAL ARCHITECT & ENGINEERING CONTRACT TASK ORDER FOR DESIGN CRITERIA PACKAGE FOR THE DESIGN-BUILD OF LC39 AREA POWER DUCTBANK REPLACEMENT. | National Aeronautics and Space Administration National Aeronautics and Space Administration | — | ORLANDO, FL-08 | 2025 | $2,269,665 |
CONT_AWD_697DCK20F00127_6920_697DCK19D00002_6920 DRY-PIPING FIRE SUPPRESSION SYSTEM STUDY AND DESIGN PER CP D09-002A | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2026 | $1,976,540 |
CONT_AWD_W9128F23F0159_9700_W912DQ21D4017_9700 DESIGN CONVERT PRIDE TO B-21 PARTS / MODIFICATION TO ADD AE CONSTRUCTION SERVICE PHASE | Department of Defense Department of the Army | — | ARLINGTON, VA-08 | 2024 | $1,973,027 |
CONT_AWD_W912QR25F0055_9700_W912QR23D0045_9700 AETO AWARDING THE BASE ONLY AT THIS TIME - BASE: CONCEPT DESIGN (NON-DESIGN) - INCLUDING 3 OPTIONS FOR POSSIBLE EXECUTION DURING THE POP AS NEEDED. | Department of Defense Department of the Army | — | COLORADO SPRINGS, CO-05 | 2025 | $1,874,466 |
CONT_AWD_697DCK20F00027_6920_697DCK19D00002_6920 2023 STANDARD UPDATE DESIGN UPDATE, ADDITIONAL TRAVEL FUNDING FOR ZSU AND ADDITIONAL ODC FUNDING PER CP D33-005 (NO COST CP) | Department of Transportation Federal Aviation Administration | — | WASHINGTON, DC-98 | 2024 | $1,872,326 |
CONT_AWD_W912QR25FA156_9700_W912QR25D0007_9700 W912QR25F1K02 LOCKBOURNE PROJECT 33 -AMEND ROD | Department of Defense Department of the Army | — | LOUISVILLE, KY-03 | 2025 | $1,595,128 |
CONT_AWD_140R2024P0021_1425_-NONE-_-NONE- MOD P00001 INCREMENTAL FUNDING FOR FY25/26 - CALSIM CLIMATE ANALYSIS DEVELOPMENT TO FACILITATE CENTRAL VALLEY PROJECT ADAPTION | Department of the Interior Bureau of Reclamation | — | SACRAMENTO, CA-07 | 2024 | $1,500,000 |
CONT_AWD_W912QR25F0093_9700_W912QR23D0045_9700 BASE - FHL WATER INFRASTRUCTURE UPGRADE | Department of Defense Department of the Army | — | JOLON, CA-18 | 2025 | $1,497,664 |
CONT_AWD_47PK0124F0023_4740_47PF0023D0006_4740 DEOBLIGATION OF FUNDS | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $1,362,231 |
CONT_AWD_47PL0324F0002_4740_47QRAA21D00AF_4732 NO COST TIME EXTENSION | General Services Administration Public Buildings Service | — | TACOMA, WA-06 | 2024 | $1,353,981 |
CONT_AWD_49100423F0233_4900_49100419A0001_4900 SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE - NO COST EXTENSION | National Science Foundation National Science Foundation | — | ARLINGTON, VA-08 | 2024 | $1,333,875 |
CONT_AWD_68HE0525F0062_6800_68HE0523D0003_6800 SFGLAES: CUYAHOGA GORGE GLLA RA ENGINEERING SUPPORT | Environmental Protection Agency Environmental Protection Agency | — | CUYAHOGA FALLS, OH-13 | 2026 | $1,284,394 |
CONT_AWD_W9127823F0099_9700_W9127820D0046_9700 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE TO 20 JUNE 2025. | Department of Defense Department of the Army | — | DALLAS, TX-30 | 2025 | $1,244,302 |
CONT_AWD_47PD0225F0008_4740_47PF0023D0006_4740 AE SERICES FEASIBILITY STUDY | General Services Administration Public Buildings Service | — | DAUPHIN ISLAND, AL-01 | 2025 | $1,199,117 |
CONT_AWD_140P2021C0007_1443_-NONE-_-NONE- STLI-211568, ARCHITECT-ENGINEER CONSTRUCTION SERVICES, STABILIZE ELLIS ISLAND SEAWALL, STATUE OF LIBERTY NATIONAL MONUMENT, ELLIS ISLAND, HUDSON COUNTY, NEW JERSEY AND NEW YORK CO… | Department of the Interior National Park Service | — | ENGLEWOOD, CO-04 | 2024 | $1,189,447 |
CONT_AWD_05GA0A23K0127_0559_05GA0A21D0004_0559 THIS ORDER IS FOR THE GAO HQ LEARNING CENTER RELOCATION, NEW CONFERENCE CENTER, AND MISSION TEAM REALIGNMENT PLANNING PROJECT. TORN DATED 7/28/23 | Government Accountability Office GAO, Except Comptroller General | — | ARLINGTON, VA-08 | 2024 | $1,144,315 |
CONT_AWD_05GA0A23K0132_0559_05GA0A21D0004_0559 THIS ORDER IS FOR THE FULL-TIME CONSTRUCTION & QUALITY ASSURANCE TECHNICAL MONITOR (TM) SERVICE FOR VARIOUS CONSTRUCTIONS AT THE GAO HEADQUARTERS BUILDING. TORN DATED 8/3/23. | Government Accountability Office GAO, Except Comptroller General | — | ARLINGTON, VA-08 | 2024 | $1,121,300 |
CONT_AWD_W912QR24F0327_9700_W912QR23D0045_9700 AE BASE SERVICES AND ECP FOR ARC IN NEWTOWN SQUARE, PENNSYLVANIA | Department of Defense Department of the Army | — | NEWTOWN SQUARE, PA-06 | 2024 | $1,078,300 |
CONT_AWD_69319519F300103_6955_69319519D000024_6955 THE PURPOSE OF THIS NO-COST BILATERAL MODIFICATION UNDER TO 69319519F300103 IS TO EXTEND THE TASK ORDER PERIOD OF PERFORMANCE FOR 6 MONTHS. | Department of Transportation Federal Transit Administration | — | WASHINGTON, DC-98 | 2024 | $1,067,405 |
CONT_AWD_68HERC25F0286_6800_68HERC23A0001_6800 PSC-R425 "STATE REVOLVING FUND (SRF) OVERSIGHT" P00001 - NO-COST MODIFICATION FOR WORK WITHIN SCOPE | Environmental Protection Agency Environmental Protection Agency | — | ARLINGTON, VA-08 | 2026 | $1,063,515 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Funding Agencies
View All→12345678910
Department of Transportation$129.4M
Department of Defense$106.9M
Environmental Protection Agency$23.1M
General Services Administration$16.7M
Government Accountability Office$7.7M
Department of the Treasury$6.1M
Department of the Interior$5.0M
National Aeronautics and Space Administration$4.4M
National Science Foundation$3.0M
Department of Agriculture$248K
Industries
View All→12345678910
ENGINEERING SERVICES$230.2M
REMEDIATION SERVICES$28.7M
ENVIRONMENTAL CONSULTING SERVICES$22.8M
ARCHITECTURAL SERVICES$15.5M
ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES$1.8M
OTHER SCIENTIFIC AND TECHNICAL CONSULTING SERVICES$1.5M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)$1.3M
CUSTOM COMPUTER PROGRAMMING SERVICES$520K
TESTING LABORATORIES AND SERVICES$196K
INTERIOR DESIGN SERVICES$0
Source: USAspending.gov · All Recipients · Virginia