TRANSPORTATION, MICHIGAN DEPARTMENT OF
LANSING, Michigan
Total Received
$7.20B
Total Awards
6K
State
Michigan
Last Updated
Apr 2, 2026
Yearly Funding Trend
$5.74B24
$1.47B26
Top 50 Awards to TRANSPORTATION, MICHIGAN DEPARTMENT OF
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through April 2, 2026.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
ASST_NON_693JJ22230000Y240MI1801046_069 PROJECT TITLE: I-75 FROM 8 MILE RD TO NORTH OF SOUTH BLVD :::: PROJECT DESCRIPTION: THE PROJECT IS FOR THE DESIGN, BUILD, OPERATE, FINANCE AND MAINTENANCE OF I-75 SEGMENT 3 WITH A… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $266,510,485 |
ASST_NON_693JJ21930000Z240MI1800433_069 PROJECT TITLE: I-75 FROM NORTH OF 13 MILE RD TO COOLIDGE HWY :::: PROJECT DESCRIPTION: THIS IS THE I-75 SEGMENT BUILD TWO OF THREE WHICH INCLUDES ROAD RECONSTRUCTION, WIDENING, AN… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $200,303,650 |
ASST_NON_693JJ22230000Z970MI22A0159_069 PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: BRIDGE REMOVAL AS PART OF THE HIP-CRRSAA BRIDGE BUNDLING PROGRAM;OTTAWA STREET OVER MUSKEGON RIVER SOUTH BRANCH; BRIDG… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-01 | 2024 | $195,978,061 |
ASST_NON_693JJ22440000Y430MI24A0815_069 PROJECT TITLE: I-375 I-75 INTERCHANGE TO ATWATER STREET :::: PROJECT DESCRIPTION: RECONSTRUCTING I-375/I-75 INTERCHANGE AND I-375 AS A NEW AT-GRADE BOULEVARD I-75 INTERCHANGE TO A… | Department of Transportation Federal Highway Administration | 20.934 NATIONALLY SIGNIFICANT FREIGHT AND HIGHWAY PROJECTS | MI-90 | 2024 | $104,657,051 |
ASST_NON_693JJ21940000Z430MI1901055_069 PROJECT TITLE: MOUND ROAD I-696 TO M-59 :::: PROJECT DESCRIPTION: RECONSTRUCT; ADD ONE LANE EACH DIRECTION FROM 17 MILE ROAD TO M-59; ADD ITS, SAFETY AND PEDESTRIAN/BIKE FEATURES.… | Department of Transportation Federal Highway Administration | 20.934 NATIONALLY SIGNIFICANT FREIGHT AND HIGHWAY PROJECTS | MI-10 | 2024 | $97,864,465 |
ASST_NON_261800426Z240_069 PROJECT TITLE: I-696 DEQUINDRE RD. TO NEIMAN RD. :::: PROJECT DESCRIPTION: CONCRETE INALY INCLUDING BARRIER, SHOULDER, AND OTHER MISC. IMPROVEMENTS;DEQUINDRE ROAD TO NEIMAN ROAD I… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-10 | 2024 | $84,698,446 |
ASST_NON_261800762Z240_069 PROJECT TITLE: I-94 W M-60 TO SARGENT ROAD :::: PROJECT DESCRIPTION: MAJOR REHABILITATION FROM M-60 TO LANSING AVENUE AND FROM ELM ROAD TO SARGENT ROAD. COMPLETE ROADWAY RECONSTRU… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-05 | 2024 | $74,671,475 |
ASST_NON_693JJ22440000Y17FMI24A0213_069 PROJECT TITLE: M-13 OVER THE EAST CHANNEL OF THE SAGINAW RIVER :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT LAFAYETTE BASCULE BRIDGE, B01-09032, M-13 & M-84 OVER EAST CHANNEL SAGI… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-08 | 2024 | $73,000,000 |
ASST_NON_693JJ22330000Y240MI23A0516_069 PROJECT TITLE: I-94 ST. JOSEPH RIVER TO BRITAIN AVENUE :::: PROJECT DESCRIPTION: RECONSTRUCTION OF I-94 LANES AND RAMPS FOR 1.2 MILES THROUGH PIPESTONE ROAD (EXIT 29). RELOCATE E… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $58,768,719 |
ASST_NON_693JJ22430000Y240MI1800433_069 PROJECT TITLE: I-75 FROM NORTH OF 13 MILE RD TO COOLIDGE HWY :::: PROJECT DESCRIPTION: THIS IS THE I-75 SEGMENT BUILD TWO OF THREE WHICH INCLUDES ROAD RECONSTRUCTION, WIDENING, AN… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $58,032,790 |
ASST_NON_261750008Z001_069 PROJECT TITLE: M-59 E M-53 TO E. OF ROMEO PLANK RD. :::: PROJECT DESCRIPTION: RECONSTRUCT;M-53 TO E OF ROMEO PLANK ROAD, CIY OF STERLING HEIGHTS, CITY OF UTIC, AND SHELBY TOWNSHIP… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-10 | 2024 | $50,382,914 |
ASST_NON_693JJ22430000Y240MI24A0612_069 PROJECT TITLE: I-96 CHILSON TO DORR :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT RUBBLIZE AND ASPHALT RESURFACING. I-96 FROM CHILSON TO DORR | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-07 | 2024 | $49,742,970 |
ASST_NON_693JJ22230000Y530MI21A0133_069 PROJECT TITLE: M-3 11 MILE ROAD TO 14 MILE ROAD :::: PROJECT DESCRIPTION: RECONSTRUCT THE ROADWAY I/C CURB AND GUTTER, DRAINAGE IMPROVEMENTS, SIGNAL UPGRADES, ADA RAMP UPGRADES, D… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-10 | 2024 | $49,440,256 |
ASST_NON_693JJ22430000Y001MI22A0637_069 PROJECT TITLE: M-102 E M-1 (WOODWARD AVENUE) TO M-53 (VAN DYKE AVENUE) :::: PROJECT DESCRIPTION: MILLING AND TWO COURSE ASPHALT RESURFACING M-1 (WOODWARD AVENUE) TO M-53 (VAN DYKE… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $45,535,188 |
ASST_NON_693JJ22630000Y240MI25A1067_069 PROJECT TITLE: I-94 E PELHAM TO EAST OF OAKWOOD :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT REPAIRS ON I-94 FROM JUST WEST OF PELHAM TO JUST EAST OF PELHAM, RECONSTRUCTION ON I-94… | Department of Transportation Federal Highway Administration | 20.287 SURFACE TRANSPORTATION BLOCK GRANT PROGRAM | MI-90 | 2026 | $44,361,660 |
ASST_NON_693JJ22430000Y114MI24A0811_069 PROJECT TITLE: I-75 FOUR BRIDGES ALONG I-75 IN DETROIT. :::: PROJECT DESCRIPTION: SUBSTRUCTURE REPAIR, EPOXY OVERLAYS, CONCRETE SURFACE COATING, PARTIAL PAINT, CONSTRAINT INDUCED… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $41,981,131 |
ASST_NON_261782067Z001_069 PROJECT TITLE: I-75 S. OF SPRINGWELLS (FORT ST.) TO N. OF CLARK :::: PROJECT DESCRIPTION: CONCRETE INLAY AND MISCELLANEOUS IMPROVEMENTS;S. OF SPRINGWELLS TO N. OF CLARK STREET, C… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $36,356,356 |
ASST_NON_693JJ22430000Y240MI22A0562_069 PROJECT TITLE: I-94 E WEST OF HELMER ROAD TO M-311 IN CALHOUN COUNTY :::: PROJECT DESCRIPTION: MILLING AND TWO COURSE ASPHALT RESURFACING, BRIDGE REPLACEMENT, TEMPORARY WIDENING,… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $36,196,210 |
ASST_NON_693JJ22630000Y460MI25A1058_069 PROJECT TITLE: I-94 MIDDLEBELT RD TO BEECH DALY RD :::: PROJECT DESCRIPTION: RECONSTRUCT, INCLUDING RECONFIGURATION OF THE ECORSE INTERCHANGE MIDDLEBELT RD TO BEECH DALY RD | Department of Transportation Federal Highway Administration | 20.278 NATIONAL HIGHWAY FREIGHT PROGRAM (NHFP) | MI-90 | 2026 | $32,249,224 |
ASST_NON_693JJ22130000Z0E1MI21A0236_069 PROJECT TITLE: I-69 NEWARK ROAD TO EAST LAPEER COUNTY LINE :::: PROJECT DESCRIPTION: THREE COURSE HMA OVERLAY WITH ASCRL;NEWARK ROAD TO EAST LAPEER COUNTY LINE; , | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-09 | 2026 | $30,139,651 |
ASST_NON_693JJ22430000Y030MI23A0984_069 PROJECT TITLE: M-14 SHELDON ROAD TO NEWBURGH ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCT FROM SHELDON RD TO NEWBURGH RD AND STR 11364 S11-82102 (SCHOOLCRAFT RD OVER M-14) DECK… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $30,000,000 |
ASST_NON_693JJ22030000Z001MI1900325_069 PROJECT TITLE: I-75 N 9 BRIDGES ON I-75 IN MONROE COUNTY :::: PROJECT DESCRIPTION: 9 BRIDGE REPLACEMENTS; 9 BRIDGES ON I-75 IN MONROE COUNTY. B01-1 & -2, HALFWAY CREEK; B02-1 AND… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-05 | 2024 | $28,541,616 |
ASST_NON_693JJ22130000Z24EMI21A0256_069 PROJECT TITLE: I-94 PORTAGE ROAD TO SPRINKLE ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION AND WIDENING AND RECONSTRUCTION AND WIDENING OF 2 RAILROAD BRIDGES AND A LARGE CULV… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-04 | 2024 | $28,031,108 |
ASST_NON_693JJ22430000Y800MI23A1031_069 PROJECT TITLE: I-475 FLINT RIVER TO CARPENTER ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION AND BRIDGE REPLACEMENT, BRIDGE REMOVAL, DECK REPLACEMENT, OVERLAY - DEEP, OVERLAY… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-08 | 2024 | $26,965,906 |
ASST_NON_693JJ22130000Z24EMI21A0255_069 PROJECT TITLE: I-94 EAST OF LOVERS LANE TO EAST OF PORTAGE ROAD :::: PROJECT DESCRIPTION: ROADWAY RECONSTRUCTION AND WIDENING AND INTERCHANGE RECONSTRUCTION;EAST OF LOVERS LANE TO… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-04 | 2024 | $26,084,895 |
ASST_NON_693JJ22430000Y240MI23A0630_069 PROJECT TITLE: M-51 CHESTNUT LANE TO M-60BR :::: PROJECT DESCRIPTION: REMOVE US-12 BRIDGES OVER M-51. REPLACE US-12 AT M-51 GRADE SEPARATED INTERCHANGE WITH SIGNALIZED INTERSECTIO… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $25,561,085 |
ASST_NON_693JJ22430000Y550MI24A0978_069 PROJECT TITLE: STATEWIDE STATEWIDE PLANNING FOR FY25 (INCL SPR II) :::: PROJECT DESCRIPTION: PROJECT IS AUTHORIZED FROM 10-1-24 TO 9-30-25. SPR TRAINING, LEARNING, & DEVELOPMENT;… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $25,005,534 |
ASST_NON_693JJ22340000Z430MI23A0953_069 PROJECT TITLE: I-94 E BLUE WATER BRIDGE PLAZA :::: PROJECT DESCRIPTION: BWB PLAZA EXPANSION WITHIN THE FOOTPRINT OF THE PROPOSED BLUE WATER BRIDGE PLAZA | Department of Transportation Federal Highway Administration | 20.934 NATIONALLY SIGNIFICANT FREIGHT AND HIGHWAY PROJECTS | MI-09 | 2024 | $25,000,000 |
ASST_NON_693JJ22230000Y530MI21A0255_069 PROJECT TITLE: I-94 EAST OF LOVERS LANE TO EAST OF PORTAGE ROAD :::: PROJECT DESCRIPTION: ROADWAY RECONSTRUCTION AND WIDENING AND INTERCHANGE RECONSTRUCTION;EAST OF LOVERS LANE TO… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-04 | 2024 | $24,391,009 |
ASST_NON_693JJ22630000Y137MI26A0457_069 PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: DEPLOYMENT OF NATIONAL ELECTRIC VEHICLE INFRASTRUCTURE FUNDS FOR CHARGING STATION CONSTRUCTION ROUND 3 STATEWIDE | Department of Transportation Federal Highway Administration | 20.277 NATIONAL ELECTRIC VEHICLE INFRASTRUCTURE | MI-90 | 2026 | $23,442,824 |
ASST_NON_693JJ22630000Y136MI26A0457_069 PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: DEPLOYMENT OF NATIONAL ELECTRIC VEHICLE INFRASTRUCTURE FUNDS FOR CHARGING STATION CONSTRUCTION ROUND 3 STATEWIDE | Department of Transportation Federal Highway Administration | 20.277 NATIONAL ELECTRIC VEHICLE INFRASTRUCTURE | MI-90 | 2026 | $23,442,775 |
ASST_NON_693JJ22330000Y240MI23A0029_069 PROJECT TITLE: US-31 N US-12 TO M-139 :::: PROJECT DESCRIPTION: HOT MIX ASPHALT OVERLAY, WITH ASPHALT STABILIZED CRACK RELIEF LAYER (ASCRL). OVERLAY ALL RAMPS. MINIMAL PRE-WORK R… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $23,243,873 |
ASST_NON_693JJ22330000Y001MI23A0190_069 PROJECT TITLE: US-10 W 7 MILE ROAD TO BAY CITY :::: PROJECT DESCRIPTION: HMA RECONSTRUCT 7 MILE ROAD EAST TO WEST BAY CITY LIMITS | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-08 | 2024 | $23,223,686 |
ASST_NON_693JJ22030000Z004MI20A0461_069 PROJECT TITLE: I-94 E BRITAIN AVENUE TO I-196 :::: PROJECT DESCRIPTION: RECONSTRUCTING I-94 TO AN URBAN SECTION FROM WEST OF BRITAIN AVENUE TO EAST OF THE I-196 INTERCHANGE AND CO… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $23,131,835 |
ASST_NON_693JJ22430000Y240MI23A0984_069 PROJECT TITLE: M-14 SHELDON ROAD TO NEWBURGH ROAD :::: PROJECT DESCRIPTION: ROAD RECONSTRUCT FROM SHELDON RD TO NEWBURGH RD AND STR 11364 S11-82102 (SCHOOLCRAFT RD OVER M-14) DECK… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $22,982,062 |
ASST_NON_693JJ22430000Y134MI24A0807_069 PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: DEPLOYMENT OF NATIONAL ELECTRIC VEHICLE INFRASTRUCTURE FUNDS FOR CHARGING STATION CONSTRUCTION ROUND 2 STATEWIDE | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $22,560,758 |
ASST_NON_693JJ22630000Y001MI25A0921_069 PROJECT TITLE: US10 BR/M-20 JEROME STREET TO WASHINGTON STREET :::: PROJECT DESCRIPTION: RECONSTRUCTION OF US-10BR FOR ALL SEGMENTS EXCEPT FOR MILL AND ONE COURSE HMA OVERLAY ON I… | Department of Transportation Federal Highway Administration | 20.279 NATIONAL HIGHWAY PERFORMANCE PROGRAM (NHPP) | MI-90 | 2026 | $22,344,290 |
ASST_NON_693JJ22030000Z240MI1801046_069 PROJECT TITLE: I-75 FROM 8 MILE RD TO NORTH OF SOUTH BLVD :::: PROJECT DESCRIPTION: THE PROJECT IS FOR THE DESIGN, BUILD, OPERATE, FINANCE AND MAINTENANCE OF I-75 SEGMENT 3 WITH A… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $22,188,100 |
ASST_NON_693JJ22440000Y390MI24A0886_069 PROJECT TITLE: I-696 PLAZA & CHURCH ST OVER I-696, 0.5 MILES EAST OF GREENFIELD :::: PROJECT DESCRIPTION: SUPERSTRUCTURE REPLACEMENT. THIS JOB WILL BE COORDINATED WITH I-696 RECON… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $21,704,970 |
ASST_NON_693JJ22130000Z24EMI1900184_069 PROJECT TITLE: I-196 I-196: MARYLAND AVENUE EAST TO I-96; I-96: LEONARD STREET E :::: PROJECT DESCRIPTION: ASPHALT RECONSTRUCTION AND WIDENING FOR AN ADDITIONAL THROUGH LANE.;I-19… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-03 | 2024 | $21,702,695 |
ASST_NON_693JJ21930000Z240MI1900318_069 PROJECT TITLE: US-131 WILLIAM R MONROE BLVD TO THE ROCKY RIVER BRIDGE :::: PROJECT DESCRIPTION: RECONSTRUCT EXISTING, NO WIDENING.; US-131 FROM WILLIAM R MONROE BLVD TO THE ROCKY… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-05 | 2024 | $21,502,640 |
ASST_NON_693JJ22430000Y001MI21A0741_069 PROJECT TITLE: I-496 LANSING ROAD TO THE GRAND RIVER :::: PROJECT DESCRIPTION: ROAD RECONSTRUCTION WITH BRIDGE MAINTENANCE;LANSING ROAD TO THE GRAND RIVER; , | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-07 | 2024 | $21,216,633 |
ASST_NON_693JJ22030000Z240MI1901233_069 PROJECT TITLE: I-94 MOUNT ELLIOT STREET OVER I-94, WAYNE COUNITY :::: PROJECT DESCRIPTION: BRIDGE REPLACEMENT;MOUNT ELLIOT STREET OVER I-94, CITY OF DETROIT, WAYNE COUNTY; , | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $21,167,062 |
ASST_NON_693JJ22230000Z46EMI1800433_069 PROJECT TITLE: I-75 FROM NORTH OF 13 MILE RD TO COOLIDGE HWY :::: PROJECT DESCRIPTION: THIS IS THE I-75 SEGMENT BUILD TWO OF THREE WHICH INCLUDES ROAD RECONSTRUCTION, WIDENING, AN… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $20,738,773 |
ASST_NON_693JJ22330000Y550MI23A0955_069 PROJECT TITLE: STATEWIDE STATEWIDE :::: PROJECT DESCRIPTION: PROJECT IS AUTHORIZED FROM 10-1-23 TO 9-30-24. SPR TRAINING, LEARNING, & DEVELOPMENT; STRATEGIC PLANNING, LONG RANGE P… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $20,451,034 |
ASST_NON_693JJ22230000Y240MI1584216_069 PROJECT TITLE: SOUTHFIELD REGIONWIDE :::: PROJECT DESCRIPTION: THE PROJECT WILL CONSTRUCT NEW AND REHAB FREEWAY LIGHTING COMPONENTS, AS WELL AS MAINTAIN THE FREEWAY SYSTEM FOR A T… | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2024 | $20,422,208 |
ASST_NON_693JJ21930000Z001MI1900113_069 PROJECT TITLE: I-75 M-13 CONNECTOR TO BEAVER ROAD :::: PROJECT DESCRIPTION: CONCRETE PAVEMENT RUBBALIZE WITH HMA OVERLAY;M-13 CONNECTOR TO BEAVER ROAD IN BAY COUNTY; , | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-08 | 2024 | $20,336,152 |
ASST_NON_693JJ22630000Y116MI25A0835_069 PROJECT TITLE: I-69 16 STRUCTURES ON I-69 :::: PROJECT DESCRIPTION: DECK REPLACEMENT, OVERLAY - DEEP, OVERLAY - SHALLOW, OVERLAY - EPOXY, BRIDGE APPROACH, DECK PATCHING - FULL DEP… | Department of Transportation Federal Highway Administration | 20.263 BRIDGE FORMULA PROGRAM | MI-08 | 2026 | $20,061,257 |
ASST_NON_693JJ22040000BDG0MI1900759_069 PROJECT TITLE: US-31 NORTH OF NAPIER AVENUE (EXIT 24) TO I-94 :::: PROJECT DESCRIPTION: NEW FREEWAY;NORTH OF NAPIER AVENUE (EXIT 24) TO I-94; ,NEW FREEWAY;NORTH OF NAPIER AVENUE (… | Department of Transportation Federal Highway Administration | 20.933 NATIONAL INFRASTRUCTURE INVESTMENTS | MI-90 | 2024 | $20,000,000 |
ASST_NON_693JJ22030000Z001MI1800015_069 PROJECT TITLE: I-75 FROM 8 MILE TO M-59, OAKLAND COUNTY :::: PROJECT DESCRIPTION: 2018-2022 OWNERS REP CONTRACT - PART 5;FROM NORTH OF 8 MILE TO SOUTH OF M-59, OAKLAND COUNTY; , | Department of Transportation Federal Highway Administration | 20.205 HIGHWAY PLANNING AND CONSTRUCTION | MI-90 | 2026 | $19,333,132 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Funding Agencies
View All→Federal Programs (CFDA)
View All→12345678910
20.205 — HIGHWAY PLANNING AND CONSTRUCTION$6.17B
20.287 — SURFACE TRANSPORTATION BLOCK GRANT PROGRAM$258.2M
20.934 — NATIONALLY SIGNIFICANT FREIGHT AND HIGHWAY PROJECTS$227.5M
20.263 — BRIDGE FORMULA PROGRAM$128.1M
20.279 — NATIONAL HIGHWAY PERFORMANCE PROGRAM (NHPP)$110.2M
20.106 — AIRPORT IMPROVEMENT PROGRAM, INFRASTRUCTURE INVESTMENT AND JOBS ACT PROGRAMS, AND COVID-19 AIRPORTS PROGRAMS$57.2M
20.277 — NATIONAL ELECTRIC VEHICLE INFRASTRUCTURE$52.1M
20.933 — NATIONAL INFRASTRUCTURE INVESTMENTS$37.4M
20.278 — NATIONAL HIGHWAY FREIGHT PROGRAM (NHFP)$34.1M
20.272 — HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP)$25.5M
Source: USAspending.gov · All Recipients · Michigan