LEGEND CONSTRUCTION AND PAINTING INC
ROSEVILLE, California
Total Received
$28.7M
Total Awards
52
State
California
Last Updated
Nov 14, 2025
Yearly Funding Trend
$21.2M24
$7.5M25
Top 50 Awards to LEGEND CONSTRUCTION AND PAINTING INC
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through November 14, 2025.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_47PK0122C0006_4740_-NONE-_-NONE- MODIFICATION FOR EASTSIDE BATHROOM REPAIRS | General Services Administration Public Buildings Service | — | SAN PABLO, CA-08 | 2024 | $4,081,520 |
CONT_AWD_47PK0125C0001_4740_-NONE-_-NONE- BASE AWARD. CONTRACT NUMBER 47PK0125C0001, PECKHAM FEDERAL BUILDING 1ST FLOOR WEST HVAC REPAIRS, 280 S 1ST STREET, SAN JOSE, CA 95113. | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2025 | $3,350,519 |
CONT_AWD_W9123821C0046_9700_-NONE-_-NONE- EXTEND THE PERIOD OF PERFORMANCE FOR PINE FLAT DAM MAINTENANCE SHOP PROJECT. | Department of Defense Department of the Army | — | FRESNO, CA-05 | 2024 | $2,627,529 |
CONT_AWD_47PK1725F0019_4740_47PK0121D0025_4740 DESIGN-BUILD FOR APPRAISER'S ELEVATORS MODERNIZATION AT THE U.S. APPRAISERS BUILDING, 630 SAMSONE ST., SAN FRANCISCO, CA. | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2025 | $2,394,197 |
CONT_AWD_47PK1321C0008_4740_-NONE-_-NONE- ADMIN MOD TO EXTEND THE PERIOD OF PERFORMANCE TO COVER THE FUNDED WARRANTY PERIOD ON THE 801 I STREET ELEVATOR MOD PROJECT LOCATED IN SACRAMENTO, CA | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $2,084,685 |
CONT_AWD_47PK1724F0034_4740_47PK0121D0025_4740 MODIFICATION 0003 TO DESCOPE RF SHIELD AND ADD FIBER CABLES FOR THE DCMA 2ND FLOOR TI AT PECKHAM FEDERAL BUILDING, SAN JOSE, CA | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2024 | $1,914,305 |
CONT_AWD_47PK1323C0001_4740_-NONE-_-NONE- MODIFICATION TO EXTEND COMPLETION DATE FROM 10/31/2023 TO 03/15/2024, AGENCY ADDED WORK. | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $1,884,117 |
CONT_AWD_47PK0522C0001_4740_-NONE-_-NONE- EXTEND PERIOD OF PERFORMANCE TO ALIGN WITH THE WARRRANTY PERIOD SERVICES AND CONSTRUCTION PERIOD IDENTIFIED ON THE FORMAL NTP. BROWNING FEDERAL BUILDING, 95 7TH STREET, SAN FRANCI… | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $1,663,086 |
CONT_AWD_47PK1323C0002_4740_-NONE-_-NONE- NO COST TIME EXTENSION CONTRACT MODIFICATION. | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $1,244,853 |
CONT_AWD_47PK1724F0035_4740_47PK0121D0025_4740 MODIFICATION PS0001 IS TO ISSUE A PARTIAL ON-SITE NTP FOR BORING WORK TO BE DONE FOR THE ICE LIFT GATE PROJECT AT JOHN MOSS FEDERAL BUILDING, 650 CAPITOL MALL, SACRAMENTO, CA 9581… | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $1,004,766 |
CONT_AWD_47PK1724F0014_4740_47PK0121D0025_4740 MODIFICATION TO INCORPORATE WITHIN SCOPE CHANGES ON THE ICE PAINT AND CARPET REFRESH PROJECT LOCATED IN SACRAMENTO, CA. THE ULTIMATE COMPLETION DATE WAS EXTENDED UNTIL 3/2/2024. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $1,001,916 |
CONT_AWD_47PK0525F0116_4740_47PK0121D0025_4740 COURTROOM CHILLER REPLACEMENT, PHILLIP BURTON FEDERAL BUILDING, 450 GOLDEN GATE AVE, SAN FRANCISCO, CA 94102 | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2025 | $999,427 |
CONT_AWD_FA468623C0019_9700_-NONE-_-NONE- CHANGE ORDER: BLDG. 23260 DATA CENTER DOORS | Department of Defense Department of the Air Force | — | BEALE AFB, CA-01 | 2024 | $993,084 |
CONT_AWD_47PK1723C0022_4740_-NONE-_-NONE- MODIFICATION PS0001 - UPDATED COMPLETION DATES BASED ON NTP | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2024 | $753,122 |
CONT_AWD_47PK1724C0010_4740_-NONE-_-NONE- ATF WALNUT CREEK DECOMMISSIONING | General Services Administration Public Buildings Service | — | WALNUT CREEK, CA-10 | 2024 | $414,260 |
CONT_AWD_47PK0725F0050_4740_47PK0121D0025_4740 PERFORM FLOORING AND PAINT PROJECTS AT THE BRT USCH AND CCY FB/USCH IN RENO, NV. | General Services Administration Public Buildings Service | — | RENO, NV-02 | 2025 | $271,223 |
CONT_AWD_47PK1322C0003_4740_-NONE-_-NONE- PROVIDE HYDROVAC EQUIPMENT DHS,ICE,650 CAPITOL MALL, SACTO, CA | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $189,504 |
CONT_AWD_47PK0524C0036_4740_-NONE-_-NONE- THIS IS AN EXPLORATORY DEMOLITION PROJECT TO ACCOMPANY AN AE PROJECT TO STUDY THE ROBERT MATSUI CTHS (CA0306ZZ) LOCATED AT 501 I STREET, SACRAMENTO, CA 95814 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $160,920 |
CONT_AWD_47PK0524C0042_4740_-NONE-_-NONE- NO COST TIME EXTENSION FOR SENATE SUITE EXPANSION PROJECT AT 501 I STREET, SACRAMENTO, CA 95814 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $151,650 |
CONT_AWD_47PK0525C0007_4740_-NONE-_-NONE- REMOVE INTERIOR WALLS WITHIN SUITE E-1711, REPLACE CARPET AND BASE, AND PAINT REMAINING WALLS THROUGHOUT THE SPACE FOR BOR LOCATED AT THE FEDERAL OFFICE BUILDING AT 2800 COTTAGE W… | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2025 | $127,203 |
CONT_AWD_47PK0525C0001_4740_-NONE-_-NONE- REFRESH SUITE 12-100 WITH NEW CARPET, PAINT AND WALL BASE AND PERFORM VARIOUS FINISH AND SIGNAGE IMPROVEMENTS FOR USSS LOCATED AT THE ROBERT T. MATSUI FEDERAL COURTHOUSE, 501 I ST… | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2025 | $126,765 |
CONT_AWD_47PK1423C0008_4740_-NONE-_-NONE- MODIFICATION TO CONTRACT TO REPLACE SIGNS ON SPEAKER NANCY PELOSI FEDERAL BUILDING. | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $119,164 |
CONT_AWD_W9123822P0049_9700_-NONE-_-NONE- EXTEND PERIOD OF PERFORMANCE. | Department of Defense Department of the Army | — | SANGER, CA-21 | 2024 | $107,800 |
CONT_AWD_47PK0524F0041_4740_47PK0121D0025_4740 PAINT WALLS AND REMOVE AND REPLACE THE CARPET IN THE USDC JUDGE'S CHAMBERS AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $96,027 |
CONT_AWD_47PK0524F0010_4740_47PK0121D0025_4740 EXTEND PERIOD OF PERFORMANCE TO END 1-31/2025 FROM 10-31-2024 FOR USDC PAINT & CARPET 19-6567 19-6534 AT 450 GOLDEN GATE SF, CA 94102 | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $90,524 |
CONT_AWD_47PK0524C0029_4740_-NONE-_-NONE- ADMINISTRATIVE MODIFICATION FOR UPDATING ASSIGNED CONTRACTING OFFICER, MAIN ENTRANCE IMPROVEMENTS, 650 CAPITOL MALL, SACRAMENTO, CA 95814 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $90,241 |
CONT_AWD_47PK1523F0032_4740_47PK0121D0025_4740 ADDITIONAL REPLACEMENT OF CAT 6 CABLE WITH THE INSTALLATION OF NEW WORKSTATIONS WITHIN THE USCIS SPACE AT 650 CAPITOL MALL, SACRAMENTO, CA 95814. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $62,610 |
CONT_AWD_47PK0524C0039_4740_-NONE-_-NONE- NO COST EXTENSION (TO FEB 28, 2025) TO INSTALL CARPET IN EARLY DECEMBER WITH AT LEAST 45 EXTENSION TO COMPLETE WORK | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2024 | $59,780 |
CONT_AWD_47PK0524C0032_4740_-NONE-_-NONE- UPDATE THE UNITED STATES MARSHAL SERVICE TRAINING ROOM WITH THE FOLLOWING ITEMS: PAINT, VINYL FLOORING, BASE COVE, ELECTRICAL OUTLETS, AND OTHER BASIC CLEANUP OF THE SPACE LOCATED… | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $56,742 |
CONT_AWD_47PK0525C0010_4740_-NONE-_-NONE- INSTALL FLOOR OUTLETS IN 3RD FLOOR LIBRARY SPACE. CA0260ZZ ROBERT F. PECKHAM FB & CH, 280 S 1ST ST., SAN JOSE, CA 95113-3002 | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2025 | $55,179 |
CONT_AWD_47PK0525C0013_4740_-NONE-_-NONE- EPLACE THE EXISTING FLAGPOLE ON THE CORNER OF 5TH AND I STREET. WORK TO BE DONE AT THE ROBERT T. MATSUI FEDERAL COURTHOUSE PLAZA, 501 I STREET, SACRAMENTO CA 95814 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2025 | $49,991 |
CONT_AWD_47PK0725F0300_4740_47PK0121D0025_4740 TO REPLACE SIGNS WITH FIRST IMPRESSIONS PROJECT APPROVED SIGNAGE AT THE PECKHAM COURTHOUSE, 280 S 1ST ST. SAN JOSA, CA. 95113. | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2025 | $44,958 |
CONT_AWD_47PK0524C0021_4740_-NONE-_-NONE- THIS IS A TIME EXTENSION ON A PROJECT FOR JUDGE CHAMBERS IMPROVEMENTS AT MATSUI FEDERAL BUILDING, 501 I STREET, SACRAMENTO, CA, 95814. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $44,813 |
CONT_AWD_47PK0524F0109_4740_47PK0121D0025_4740 NO COST TIME EXTENSION FOR THE REPLACEMENT OF SOME INTERIOR SIGNAGE AT THE FEDERAL BUILDING AT 280 FIRST ST., SAN JOSE, CA 95113-2284. | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2024 | $37,390 |
CONT_AWD_47PK0524F0049_4740_47PK0121D0025_4740 COMPLETE A RECONFIGURATION OF LIGHTS WITHIN THE USBR E-1815 OFFICE SUITE LOCATED AT THE FEDERAL OFFICE BUILDING, 2800 COTTAGE WAY, SACRAMENTO CA 95825. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2024 | $37,144 |
CONT_AWD_47PK0725F0337_4740_47PK0121D0025_4740 REPAIR DAMAGES FROM THE WATER LEAK THAT AFFECTED THE 6TH, 5TH, 4TH, 3RD AND THE 2ND FLOOR LOCATED AT THE ROBERT T. MATSUI FEDERAL COURTHOUSE, 501 I ST., SACRAMENTO, CA 95814 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2025 | $34,523 |
CONT_AWD_47PK0525F0088_4740_47PK0121D0025_4740 COMPLETE RENOVATIONS TO THE EMPLOYEE BREAKROOM WITHIN THE PRE-TRIAL OFFICE SPACE ON THE 2ND FLOOR LOCATED AT 501 I STREET, SACRAMENTO CA 95814. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2025 | $32,818 |
CONT_AWD_47PK0524C0018_4740_-NONE-_-NONE- INSTALL A CARD ACCESS READER STATION LOCATED AT 2800 COTTAGE WAY, SACRAMENTO, CA 95828. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2024 | $29,266 |
CONT_AWD_47PK0724C0007_4740_-NONE-_-NONE- REPLACE THE CARPET WITHIN THE KENNEDY LEARNING CENTER (KLC) STACKS/READING AREA ROOM IN THE CIRCUIT LIBRARY FOR COURT OF APPEALS LOCATED AT 501 I ST., SUITE 1-400, SACRAMENTO, CA… | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $28,377 |
CONT_AWD_47PK0524C0043_4740_-NONE-_-NONE- PROVIDE LABOR, MATERIALS AND EQUIPMENT TO PAINT FIVE OFFICES, INSTALL TWO WI-FI ACCESS POINTS, INSTALL FOUR 208-V CIRCUIT THE SERVER ROOM ON THE 3RD AND 4TH FLOOR LOCATED AT THE F… | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $26,291 |
CONT_AWD_47PK1423C0015_4740_-NONE-_-NONE- EXTENDS CAFE IMPROVEMENT PROJECT TO ALLOW COMPLETION AT 2800 COTTAGE WAY, SACRAMENTO, CA 95825. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2024 | $25,222 |
CONT_AWD_47PK0524F0033_4740_47PK0121D0025_4740 THIS PROJECT IS FOR PAINTING IN THE FREIGHT ELEVATOR VESTIBULE AT 450 GOLDEN GATE AVE, SAN FRANCISCO, CA. | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $24,999 |
CONT_AWD_47PK0524F0040_4740_47PK0121D0025_4740 REPAIR AND PAINT IDENTIFIED CONCRETE WALLS LOCATED THROUGHOUT THE EXTERIOR OF THE JOHN E. MOSS FEDERAL BUILDING LOCATED AT 650 CAPITOL MALL, SACRAMENTO, CA 95814 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-07 | 2024 | $21,523 |
CONT_AWD_47PK0524C0035_4740_-NONE-_-NONE- ADDRESS SAFETY CONCERNS AT THE CHILD CARE CENTER LOCATED AT THE CHILD CARE CENTER, 2800 COTTAGE WAY, SACRAMENTO CA 95825. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2024 | $21,282 |
CONT_AWD_47PK0524C0006_4740_-NONE-_-NONE- UPGRADE THE WATER STATIONS ON THE 18TH FLOOR AT THE PHILIP BURTON FEDERAL BUILDING, 450 GOLDEN GATE AVE, SF, CA | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2024 | $19,196 |
CONT_AWD_47PK0524C0033_4740_-NONE-_-NONE- MODIFY EXISTING KITCHEN COUNTERS IN THE CHILD CARE CENTER KITCHEN AND INSTALL NEW GSA PROVIDED DISHWASHER LOCATED AT THE CHILD CARE CENTER, 2800 COTTAGE WAY, SACRAMENTO CA 95825 | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2024 | $15,273 |
CONT_AWD_47PK0524F0110_4740_47PK0121D0025_4740 REPLACE EXTERIOR SIGNS AND MAP DISPLAYS NEXT TO BOTH ENTRANCES AND REFINISH THE SIGN SUPPORTS. CA02600ZZ, 280 S. 1ST STREET, ROOM 378 SAN JOSE, CA 95113 USA | General Services Administration Public Buildings Service | — | SAN JOSE, CA-18 | 2024 | $12,801 |
CONT_AWD_47PK0524C0030_4740_-NONE-_-NONE- INSTALL 10 NEW 120V CIRCUITS SUPPORTING L5-20R OUTLETS IN ROOM 2213 FOR THE FBI LOCATED AT 2001 FREEDOM WAY, ROSEVILLE, CA 95825. | General Services Administration Public Buildings Service | — | ROSEVILLE, CA-03 | 2024 | $9,846 |
CONT_AWD_47PK0525C0015_4740_-NONE-_-NONE- FBI ELECTRICAL WORK IN 13-5202 AT 450 GOLDEN GATE AVE SF, CA 94102 | General Services Administration Public Buildings Service | — | SAN FRANCISCO, CA-11 | 2025 | $7,058 |
CONT_AWD_47PK0524C0026_4740_-NONE-_-NONE- PATCH AND PAINT ONE ACCENT WALL IN PRIVATE OFFICE E-1907 FOR BOR LOCATED AT 2800 COTTAGE WAY, SACRAMENTO CA 95828. | General Services Administration Public Buildings Service | — | SACRAMENTO, CA-06 | 2024 | $2,570 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Industries