GRANITE CONSTRUCTION COMPANY
WATSONVILLE, California
Total Received
$1.30B
Total Awards
24
State
California
Last Updated
Mar 16, 2026
Yearly Funding Trend
$550.6M24
$52.9M25
$692.9M26
Top 24 Awards to GRANITE CONSTRUCTION COMPANY
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through March 16, 2026.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_70B01C26F00000165_7014_70B01C26D00000004_7014 BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4 | Department of Homeland Security U.S. Customs and Border Protection | — | LAREDO, TX-28 | 2026 | $512,334,000 |
CONT_AWD_69056723C000008_6925_-NONE-_-NONE- AK NPS DENA 10(49) POLYCHROME AREA IMPROVEMENTS - PROVIDES COMPENSATION TO THE CONTRACTOR FOR THE WORK ASSOCIATED WITH THE OPTION W3B TEMPORARY LAUNCH TRUSS DESIGN. | Department of Transportation Federal Highway Administration | — | DENALI NATIONAL PARK, AK-00 | 2024 | $214,934,133 |
CONT_AWD_W9123823C0014_9700_-NONE-_-NONE- SAC WEIR CONST - NON - FEDERAL FUNDING | Department of Defense Department of the Army | — | WEST SACRAMENTO, CA-07 | 2024 | $175,244,150 |
CONT_AWD_70B01C25F00000194_7014_70B01C23D00000011_7014 ADMINISTRATIVE MOD | Department of Homeland Security U.S. Customs and Border Protection | — | WESLACO, TX-34 | 2026 | $169,059,512 |
CONT_AWD_W9126G24C0032_9700_-NONE-_-NONE- DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TX | Department of Defense Department of the Army | — | EL PASO, TX-16 | 2024 | $76,324,983 |
CONT_AWD_W9126G23C0013_9700_-NONE-_-NONE- 3 LEVEE REACH2/VINYARD & HARRISON SUMPS | Department of Defense Department of the Army | — | WHARTON, TX-22 | 2024 | $48,383,972 |
CONT_AWD_W912P725CA018_9700_-NONE-_-NONE- PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSO… | Department of Defense Department of the Army | — | WATSONVILLE, CA-18 | 2025 | $39,330,400 |
CONT_AWD_W9123823C0006_9700_-NONE-_-NONE- FY 23 HRC FEDERAL FUNDING | Department of Defense Department of the Army | — | FOLSOM, CA-03 | 2024 | $16,561,661 |
CONT_AWD_N6247319F5250_9700_N6247319D2437_9700 ST16-1341 DBB REPAIR FAILING TAXIWAY INDIA, RWY 36, NASNI | Department of Defense Department of the Navy | — | SAN DIEGO, CA-50 | 2024 | $14,515,073 |
CONT_AWD_W9126G25C0003_9700_-NONE-_-NONE- ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | Department of Defense Department of the Army | — | DALLAS, TX-33 | 2025 | $13,543,885 |
CONT_AWD_69056726F00019N_6925_69056725D000003_6925 CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING. | Department of Transportation Federal Highway Administration | — | BONNERS FERRY, ID-01 | 2026 | $8,020,423 |
CONT_AWD_69056725C000008_6925_-NONE-_-NONE- OR FLAP UMATILL 582(1) MILL CREEK ROAD - THIS MODIFICATION DEFINITIZING CM ADDRESSING ANCHORED WIRE MESH QUANTITY AND UTILITY ADJUSTMENTS | Department of Transportation Federal Highway Administration | — | WALLA WALLA, WA-05 | 2026 | $3,523,644 |
CONT_AWD_6982AF20C000014_6925_-NONE-_-NONE- THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE THE REMAINING FUNDS. UNABLE TO CLOSE OUT DUE TO CONTRACTOR'S RESERVATION RIGHTS TO CLAIM. | Department of Transportation Federal Highway Administration | — | ESTES PARK, CO-02 | 2024 | $3,444,288 |
CONT_AWD_N6893622P0001_9700_-NONE-_-NONE- ADD AMENDED SOW | Department of Defense Department of the Navy | — | WATSONVILLE, CA-18 | 2024 | $735,392 |
CONT_AWD_FA500024F0049_9700_FA500023A0019_9700 BPA FOR ASPHALT SUPPLIES FOR JBER (2024) | Department of Defense Department of the Air Force | — | JBER, AK-00 | 2024 | $500,000 |
CONT_AWD_FA820125FG163_9700_FA820124A0002_9700 MISCELLANEOUS CONSTRUCTION MATERIALS | Department of Defense Department of the Air Force | — | WATSONVILLE, CA-18 | 2025 | $18,281 |
CONT_AWD_N6247325F5234_9700_N6247325D5228_9700 MINIMUM GUARANTEE - GRANITE CONSTRUCTION | Department of Defense Department of the Navy | — | SAN DIEGO, CA-50 | 2025 | $5,000 |
CONT_IDV_69056725D000003_6925 THIS CONTRACT MODIFICATION (P00003) WILL DE-OBLIGATE THE GUARANTEED MINIMUM OF $10,000.00 FOR THE IDAHO, MONTANA, AND SURROUNDING AREAS MATOC THAT WAS MET BY AWARD OF A TASK ORDER… | Department of Transportation Federal Highway Administration | — | — | 2026 | $0 |
CONT_IDV_70B01C26D00000004_7014 MULTIPLE AWARD IDIQ CONSTRUCTION ON SOUTHWEST BORDER - WAIVER 90 FED REG 48281-48290 | Department of Homeland Security U.S. Customs and Border Protection | — | — | 2026 | $0 |
CONT_IDV_N6247325D5228_9700 AIRFIELD PAVING MACC VI - BASE PERIOD | Department of Defense Department of the Navy | — | — | 2025 | $0 |
CONT_IDV_N6247319D2437_9700 BRIDGE MODIFICATION TO EXTEND PERIOD OF PERFORMANCE | Department of Defense Department of the Navy | — | — | 2024 | $0 |
CONT_IDV_FA820124A0002_9700 ROAD AND RUNWAY MATERIALS | Department of Defense Department of the Air Force | — | — | 2024 | $0 |
CONT_IDV_FA500420D0005_9700 INTERIOR ALASKA MILITARY INSTALLATIONS REQUIRE PAVING PROJECTS OF VARIOUS SIZE AND NATURE OF ROADS, PARKING LOTS, AIRFIELDS, AND OTHER MISC PAVING REQUIREMENTS TO BE ACCOMPLISHED… | Department of Defense Department of the Air Force | — | — | 2024 | $0 |
CONT_IDV_FA500023A0019_9700 BPA FOR FY25 ASPHALT SUPPLIES FOR JBER | Department of Defense Department of the Air Force | — | — | 2024 | $0 |
Top 24 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Source: USAspending.gov · All Recipients · California