Skip to main content

National Aeronautics and Space Administration in Alaska

Federal obligations from National Aeronautics and Space Administration to Alaska

Total obligated

$101.4M

Awards

101

$98,586,104.10 in USAspending.gov obligations is the National Aeronautics and Space Administration total coded to Alaska, across 98 awards. The pair is NASA plus Alaska, not a statewide space budget. Awarding-agency 080 and Alaska (AK) are the pair. Ninety-eight records against $98,586,104.10 is a thin NASA file: few rows, a high implied mean near a million dollars per record. The implied mean is about $1.01 million per award — a quotient of two packet facts, not a typical project. USAspending.gov is the source. Amounts are obligations, not outlays.

Key figures

  • NASA in Alaska: $98,586,104.10 across 98 USAspending awards.
  • Implied mean about $1.01 million per record — a packet quotient, not a typical project.
  • Agency 080 × AK is not a measure of unique missions, named centers, or unique contractors.
  • Cite obligations from USAspending.gov, not outlays.
  • Anchorage, Fairbanks, Juneau, and the rest of the boroughs share one AK place-of-performance tag.

NASA awards tagged to Alaska

National Aeronautics and Space Administration as awarding agency, Alaska as place-of-performance: 98 records summing to $98,586,104.10. A National Aeronautics and Space Administration award coded outside AK is out. An award in Alaska from a different awarding agency is out even if the topic sounds related. Alaska (AK) excludes Washington, Oregon, and Canada. A Seattle-coded award is WA even if a payload later flies from Alaska. Centers and mission directorates inside awarding agency 080 are unpublished splits.

Ninety-eight records against $98,586,104.10 is a thin NASA file: few rows, a high implied mean near a million dollars per record. Unique recipients are unpublished. Do not read 98 as 98 unique missions, named centers, or unique contractors. The overlay National Aeronautics and Space Administration in Alaska is the both-keys table. Alaska federal spending is the all-agency state hub. National Aeronautics and Space Administration is the agency book without an AK filter. All spending ties lists other joins. Named ranges and university labs are unpublished. Do not assign 98 awards to a single Alaska launch site. Correlation is not causation: Alaska did not cause $98,586,104.10 by existing as a large or small place. Population and outcome scores are not packet facts. The join is 080 × AK only.

Not a Fairbanks launch ledger or contractor roster

$98,586,104.10 does not measure unique missions, named centers, or unique contractors. Those series are not USAspending fields on this aggregate. The cell sums award obligations with awarding-agency code 080 and an AK place-of-performance tag. Centers and mission directorates inside awarding agency 080 are unpublished splits.

Do not treat 98 awards as a census of unique missions, named centers, or unique contractors. Parent hubs are supposed to be larger than this pair. If Alaska federal spending or National Aeronautics and Space Administration matched $98,586,104.10 and 98, the join would be pointless. Use the overlay when both keys must stay on. Washington, Oregon, and California NASA joins are other pairs, not addends. Place of performance AK is not a commute from a Lower 48 NASA center. Keep the Alaska tag on $98,586,104.10.

Full analysis: National Aeronautics and Space Administration federal obligations in Alaska

Questions

How much has the National Aeronautics and Space Administration obligated in Alaska?
USAspending.gov records $98,586,104.10 across 98 awards with awarding agency 080 and an Alaska tag. That is an obligation join, not an outlay and not a count of unique missions, named centers, or unique contractors. National Aeronautics and Space Administration in Alaska is the live overlay for this pair. Keep both keys when quoting $98,586,104.10.
Is $98,586,104.10 a measure of unique missions, named centers, or unique contractors?
No. The packet publishes $98,586,104.10 and 98 awards for agency 080 inside AK coding. Those other series are unpublished here. Unique recipients are unpublished. Quote the dollar total and the award count together. Obligations are not outlays. Keep both keys.
Does 98 NASA awards mean 98 Alaska launches?
No. 98 is the award-record count for 080 × AK. Combined with $98,586,104.10, the average is about $1.01 million. Modifications and repeat instruments add rows. 98 is not unique missions, named centers, or unique contractors. Later ingests can revise the count. Prefer the overlay if the table moved.
Where is the live NASA–Alaska table?
National Aeronautics and Space Administration in Alaska is the overlay. Alaska federal spending and National Aeronautics and Space Administration are the parents, not addends. All spending ties lists other pairs. Keep both sides of the join when citing $98,586,104.10. USAspending.gov is the source. Obligations are not outlays.

USAspending.gov aggregate of federal obligations by state and awarding agency. Obligations are not outlays.

How this pair fits

All data ties →

Explore related views: National Aeronautics and Space Administration profile · All states for this agency · All spending in Alaska