Skip to main content

Highway Planning and Construction in Michigan

CFDA 20.205 — federal program obligations to Michigan

Total obligated

$6.55B

Awards

5K

Highway Planning And Construction (CFDA 20.205) shows $6,282,144,096.39 in USAspending.gov obligations with Michigan as place of performance. Four thousand eight hundred twenty-seven awards carry that total. The join is FHWA's Highway Planning and Construction listing crossed with a Michigan location field, not MDOT's entire budget and not a lane-mile census. The dollars are commitments, not Treasury outlays.

Key figures

  • CFDA 20.205 in Michigan shows $6,282,144,096.39 in USAspending obligations on 4,827 awards.
  • Awards are assistance rows, not a count of lane-miles, unique contractors, or named Interstates.
  • The join is CFDA 20.205 plus Michigan place of performance, not the entire Michigan transportation budget.
  • The total is commitments, not outlays. FEC donations do not fund this cell.

Michigan × 20.205 is a highway join, not a pothole score

This page pairs CFDA 20.205, HIGHWAY PLANNING AND CONSTRUCTION, with Michigan place of performance. SpendingVault sums tagged obligations: $6,282,144,096.39 on 4,827 awards. The join is FHWA's Highway Planning and Construction listing crossed with a Michigan location field, not MDOT's entire budget and not a lane-mile census. Treat the pair as a catalog intersection, not a ranking, and not a claim that 4,827 awards equal that many lane-miles, unique contractors, or named Interstates.

Bridge, transit, and safety listings on other DOT codes stay outside $6,282,144,096.39 unless they also carry 20.205. Correlation between this obligation sum and local need statistics is not causation. Those statistics are not in the packet. Michigan (MI) excludes Ohio, Indiana, and Wisconsin. An Ohio-coded highway award is another cell even if a corridor crosses Toledo. Place of performance as Michigan locates the tagged awards; it does not deposit $6,282,144,096.39 in the state treasury.

More FHWA rows than Texas, a smaller dollar book

Mean obligation is about $1.30 million if $6,282,144,096.39 were divided evenly across 4,827 lines. That ratio is a quotient of two packet facts, not a published typical award. Four thousand eight hundred twenty-seven records exceeds Texas's 3,355-row highway file on a much smaller obligation total, which lowers the implied mean. Award count is a row count, including possible continuations. It is not a census of lane-miles, unique contractors, or named Interstates.

Four thousand eight hundred twenty-seven awards are scannable on the overlay. This page will not invent recipient names. Open Highway Planning And Construction in Michigan for the stored table. Detroit, Grand Rapids, and the Mackinac corridor are unpublished. Do not treat 4,827 as a named-Interstate inventory. The $6,282,144,096.39 total remains an obligation rollup on tagged awards.

Full analysis: Highway Planning and Construction federal funding in Michigan

Questions

How much Highway Planning And Construction funding is obligated in Michigan?
USAspending.gov shows $6,282,144,096.39 in obligations for CFDA 20.205 with Michigan as place of performance, across 4,827 awards. The sum is a commitment total on assistance awards, not outlays and not Michigan's entire federal-spending total. Other listings are outside this join unless they also carry 20.205.
Do 4,827 awards equal 4,827 Michigan highway projects?
No. Award count is a row count of assistance awards and can include continuations. It is not a census of lane-miles, unique contractors, or named Interstates. The packet does not name recipients. See Highway Planning And Construction in Michigan for named lines as USAspending stored them. The implied mean near $1.30 million is a ratio, not a typical unit.
Is this Michigan's entire Michigan transportation budget?
No. The join is CFDA 20.205 crossed with Michigan place of performance. Related programs on other CFDA numbers are not inside $6,282,144,096.39 unless the award also carries 20.205. Bridge, transit, and safety listings on other DOT codes stay outside $6,282,144,096.39 unless they also carry 20.205. Mixing catalogs would invent a combined figure the packet never computed.
Is the Highway Planning And Construction total already paid in Michigan?
Not on this metric. Obligations are recorded commitments on assistance awards. Outlays are payments from the Treasury. The $6,282,144,096.39 headline is the obligation rollup in SpendingVault's extract. Completed activity and remaining balances are not published in this packet.

USAspending.gov CFDA program aggregates by place of performance state. Obligations are not outlays.

How this pair fits

All data ties →

Explore related views: National Highway Planning and Construction profile · All programs in Michigan · All spending in Michigan