Broadband Equity, Access, and Deployment Program in Mississippi
CFDA 11.035 — federal program obligations to Mississippi
Total obligated
$1.20B
Awards
1
The Broadband Equity, Access, and Deployment Program (CFDA 11.035) shows $1,203,561,563 in USAspending.gov obligations coded to Mississippi across 1 award. The pair is an NTIA BEAD catalog line joined to place of performance, not a ranking of Delta counties by unserved locations and not a count of fiber miles. Obligations are commitments, not construction draws.
Key figures
- CFDA 11.035 shows $1,203,561,563 in Mississippi obligations on 1 award.
- With one award, the mean equals the total.
- The catalog is BEAD, not High Cost USF.
- Mississippi is a place-of-performance tag, not a fiber-mile ranking.
- Figures are obligations, not outlays.
One prime award carries Mississippi’s BEAD allocation
This tie keeps USAspending assistance where CFDA 11.035 meets Mississippi place of performance. The dollar book is $1,203,561,563. The award count is 1. BEAD state allocations typically post as a single large award to the designated state recipient. One prime record does not mean one ISP was selected, and it does not isolate the Delta from the Gulf Coast.
The join does not prove that Mississippi’s unserved-location count, rural density, or a particular middle-mile map caused $1,203,561,563. Those are other series. This packet has no project list. Correlation is not causation. Packet facts stop at $1,203,561,563, 1 award, MS, and 11.035.
11.035 is not High Cost USF in Mississippi
Universal Service Fund High Cost (CFDA 32.002) is a different catalog. Mixing USF into $1,203,561,563 would invent a broader telecom total than this cell contains. Facts available: Mississippi, CFDA 11.035, $1,203,561,563, 1 award. FCC map locations and ISP subawards are not in the facts.
With one award, the implied mean equals $1,203,561,563. Downstream subawards to ISPs are not additional prime awards in this extract. Unique recipients are unpublished. 1 is not a count of passing addresses.
Full analysis: BEAD broadband obligations in Mississippi →
Questions
- How much BEAD spending is in Mississippi?
- USAspending.gov shows $1,203,561,563 in CFDA 11.035 obligations coded to Mississippi across 1 award. The join uses the program number and Mississippi place of performance. The total is obligations, not outlays. Keep Broadband Equity, Access, And Deployment Program and Mississippi together when citing $1,203,561,563.
- Why is there only 1 award for about $1.20 billion?
- BEAD state allocations often post as a single large prime award to the designated state recipient. The extract counts 1 record tagged to CFDA 11.035 and Mississippi. With one award, the implied mean equals the total: $1,203,561,563.
- Is $1.20 billion Mississippi’s full federal spending?
- No. $1,203,561,563 is only the BEAD cell. Other CFDA programs with Mississippi place of performance sit on the statewide hub. Nationwide 11.035 is not limited to Mississippi. Obligations of $1,203,561,563 are not outlays.
- Do these obligations equal broadband construction completed?
- No. $1,203,561,563 is an obligation sum. Outlays are a different USAspending series. Construction draws can lag the federal obligation by years. This packet has no fiber-mile count. Original filings remain on USAspending.gov for this 11.035 × MS pair.
USAspending.gov CFDA program aggregates by place of performance state. Obligations are not outlays.
How this pair fits
Explore related views: National Broadband Equity, Access, and Deployment Program profile · All programs in Mississippi · All spending in Mississippi