Consolidated Rail Infrastructure and Safety Improvements Program – Special Transportation Circumstances in Wyoming
CFDA 20.338 — federal program obligations to Wyoming
Total obligated
$60.9M
Awards
2
Consolidated Rail Infrastructure And Safety Improvements Program – Special Transportation Circumstances (CFDA 20.338) obligations coded to Wyoming total $60,906,278 on USAspending.gov across 2 awards. Two instruments against that sum produce a mean of about $30.45 million per award. This page joins FRA catalog 20.338 to the Wyoming place-of-performance tag. It is not a mile-of-track inventory, a crossing census, or cash already paid.
Key figures
- CFDA 20.338 shows $60,906,278 in Wyoming obligations on 2 awards.
- The mean is about $30.45 million per award.
- The catalog is CRISI Special Transportation Circumstances, not every FRA rail line.
- Wyoming is a place-of-performance tag, not a track census.
- Figures are obligations, not outlays.
Wyoming and CFDA 20.338 as a join
CFDA 20.338 is titled CONSOLIDATED RAIL INFRASTRUCTURE AND SAFETY IMPROVEMENTS PROGRAM – SPECIAL TRANSPORTATION CIRCUMSTANCES. The em dash in the catalog title is part of the program name; it is not a second CFDA number. Filtered to Wyoming place of performance, obligations sum to $60,906,278 on 2 awards. The national 20.338 hub includes every other state. Wyoming federal spending includes every other program. This tie is the intersection.
An obligation is a recorded commitment, not an outlay. The packet publishes no fiscal year, so $60,906,278 cannot be read as a single construction season. Correlation between Wyoming geography and 20.338 coding is not evidence that a named rail line was rebuilt, a crossing was closed, or freight volume changed.
Packet facts stop at Wyoming, CFDA 20.338, $60,906,278, and 2 awards. Recipient names, railroad identifiers, and project descriptions are absent. Do not invent contractors, carriers, or award recipients.
20.338 is not the main CRISI catalog in Wyoming
Other Consolidated Rail Infrastructure and Safety Improvements lines and other FRA or FTA catalogs sit on different CFDA numbers. Mixing those dollars into $60,906,278 would invent a broader total than this 20.338 × WY cell contains. Facts available: Wyoming, CFDA 20.338, $60,906,278, 2 awards. The program name on the packet includes the Special Transportation Circumstances clause; that clause is the catalog, not a footnote.
Dividing $60,906,278 by 2 yields about $30.45 million per award. That average is an implied mean of two large instruments, not a typical tie-replacement cost and not a median. Unique recipients are unpublished. Two is not a count of Wyoming rail lines, depots, or counties.
Full analysis: CRISI Special Transportation Circumstances funding in Wyoming (CFDA 20.338) →
Questions
- How much CFDA 20.338 funding is obligated in Wyoming?
- USAspending.gov shows $60,906,278 in CFDA 20.338 obligations coded to Wyoming across 2 awards. The catalog is Consolidated Rail Infrastructure And Safety Improvements Program – Special Transportation Circumstances. The total is obligations, not outlays. Keep 20.338 and Wyoming together when citing $60,906,278.
- Is 20.338 the same as every CRISI grant in Wyoming?
- No. This cell is CFDA 20.338 only, the Special Transportation Circumstances line. Other rail-improvement catalogs use other numbers. Mixing those dollars would invent a total larger than $60,906,278. Two is a record count, not a project census.
- Does 2 awards mean 2 Wyoming railroads received grants?
- Two is a USAspending award-record count, not a railroad, mile, or crossing census. The implied mean is about $30.45 million per award. Unique recipients are unpublished. Obligations of $60,906,278 are not outlays. Packet facts stop at $60,906,278, 2 awards, WY, and 20.338. Place of performance is a geography tag, not a roster of named recipients.
- Do these obligations equal completed track work?
- No. $60,906,278 is an obligation sum. Outlays are a different USAspending series. This packet has no project or mile count. Keep the obligation label when citing the 20.338 × WY pair. Keep the obligation label on $60,906,278 and name both Consolidated Rail Infrastructure And Safety Improvements Program – Special Transportation Circumstances and Wyoming. Original filings for CFDA 20.338 remain on USAspending.gov.
USAspending.gov CFDA program aggregates by place of performance state. Obligations are not outlays.
How this pair fits
Explore related views: National Consolidated Rail Infrastructure and Safety Improvements Program – Special Transportation Circumstances profile · All programs in Wyoming · All spending in Wyoming