Skip to main content
← All data ties

Child Care and Development Block Grant obligations in Arizona

USAspending.gov records $2,280,976,280.54 in Child Care and Development Block Grant obligations (CFDA 93.575) with place of performance in Arizona, across 144 awards. One hundred forty-four instruments against $2.28 billion produce a mean of about $15.8 million per award. This page joins HHS catalog 93.575 to the AZ geography tag. It is not a provider directory and not Arizona’s full federal total. Obligations are not outlays.

Key figures

  • CFDA 93.575 shows $2,280,976,280.54 in Arizona obligations on 144 awards.
  • Mean obligation is about $15.8 million per award.
  • The catalog is CCDBG, not Head Start or HUD housing grants.
  • Arizona is a geography tag, not a county ranking.
  • Figures are obligations, not outlays.

Block grant dollars tagged to Arizona

CFDA 93.575 (CHILD CARE AND DEVELOPMENT BLOCK GRANT) plus Arizona place of performance sums to $2,280,976,280.54 on 144 awards. The national 93.575 page includes every state. The Arizona spending page includes every CFDA. This tie reports the overlap.

One hundred forty-four awards is a longer instrument list than many statewide blocks that post about ten awards. The join still does not name providers, split Maricopa from rural counties, or count subsidized children. Packet facts are $2,280,976,280.54, 144 awards, AZ, and 93.575.

Readers sometimes treat a large CFDA–state total as if it were a budget line the state legislature passed. $2,280,976,280.54 is not that. It is the USAspending obligation sum on awards tagged 93.575 and AZ. The overlay table at the program-in-state path is the same cell rendered as a page; this narrative is the join explained in prose. Nothing here ranks Arizona against other states on need, performance, or politics.

One hundred forty-four awards totaling $2,280,976,280.54 (about $15.84 million mean) is CCDBG tagged Arizona. IHBG is a HUD catalog and stays out. A longer instrument list lowers the mean relative to ten-award blocks; it does not count children.

93.575 is not housing and not Head Start

Indian Housing Block Grants and Head Start use other CFDA numbers. Mixing those catalogs into $2,280,976,280.54 would invent a total this cell does not contain.

Facts here: Arizona, CFDA 93.575, $2,280,976,280.54, 144 awards. Copays, reimbursement rates, and quality-rating scores are not in the facts. The title names the block grant, not a verdict on Arizona child-care supply.

The only numeric facts on this packet are $2,280,976,280.54, 144 awards, CFDA 93.575, program title Child Care And Development Block Grant, and geography AZ/Arizona. Any other dollar, year, recipient, or percentage would be invented. Trivial arithmetic from those facts is allowed: 144 awards into $2,280,976,280.54 is about $15.84 million per award. That quotient is a mean of records, not a typical household, student, or lab.

Arizona IHBG is HUD. This page is HHS 93.575. $2,280,976,280.54 on 144 awards is child-care block grant funding tagged AZ. Tribal child-care, if cataloged separately, would be another number.

Arizona as place of performance

AZ is the USAspending state tag. Awards billed to Phoenix or to local agencies can share the code. Awards coded to New Mexico, California, Utah, or Nevada stay outside $2,280,976,280.54.

Arizona federal spending is the all-program parent. CFDA 93.575 is one row on the Arizona programs list. $2.28 billion is not the state’s complete federal footprint.

Place of performance AZ is a two-letter code in the award file. It can mark a state capital, a campus, a housing authority, a transit agency, or a default statewide tag. It does not prove where every subcontract ran, and it does not convert $2,280,976,280.54 into a county map. Awards with a different state code are outside this cell even if people, patients, or riders cross the border.

A 144-award mean near $15.8 million

$2,280,976,280.54 ÷ 144 is about $15.8 million per award. A three-digit award count pulls the mean below cells that post ten statewide instruments. The average is still larger than a typical household subsidy and is not a median. The aggregate is net obligations supplied in the facts.

Treat 144 as a record count in an aggregate, not as 144 finished projects. USAspending obligations can be positive new awards or net of downward modifications; the $2,280,976,280.54 figure is the net total supplied in the facts. Without a transaction register on this page, you cannot see how many of the 144 rows are continuations, renewals, or corrections.

Using the Child Care And Development Block Grant–Arizona overlay

The overlay target for this tie is the Arizona × CFDA 93.575 table. Open that path when you want the same $2,280,976,280.54 / 144-award cell in the site’s data chrome. The national program page for CFDA 93.575 drops the Arizona filter. The Arizona spending hub drops the CFDA filter. The Arizona programs index lists other catalogs beside Child Care And Development Block Grant. All spending ties is the directory of other pairs.

This page exists because two tables meet: a CFDA program and a place-of-performance state. It does not exist to argue that Arizona “won” or “lost” federal money, that donations paid for the awards, or that obligations equal cash. Correlation is not causation. The headline number remains $2,280,976,280.54 on 144 awards, from USAspending.gov, for Child Care And Development Block Grant in Arizona.

What the pair cannot say

A large 93.575 total in Arizona does not measure waitlists or quality, and it does not equal cash already drawn. FEC contribution files do not finance this USAspending cell. Correlation is not causation.

See Child Care And Development Block Grant in Arizona, CFDA 93.575, Arizona federal spending, Arizona programs, and All spending ties.

Questions

How much Child Care and Development Block Grant funding is obligated in Arizona?
USAspending records $2,280,976,280.54 in CFDA 93.575 obligations with Arizona place of performance across 144 awards. That is the pair aggregate, not an outlay and not every early-childhood CFDA.
Does this include Head Start?
No. Head Start uses a different CFDA number. This page is 93.575 only. The $2,280,976,280.54 total does not absorb Head Start awards.
Why 144 awards?
The facts show 144 awards totaling $2,280,976,280.54. This cell has a longer instrument list than some statewide blocks. Provider counts are not in the packet facts.
What is the average award?
About $15.8 million ($2,280,976,280.54 ÷ 144). That mean is not a typical provider contract and not a per-child subsidy.

USAspending.gov CFDA program aggregates by place of performance state. Obligations are not outlays.