Skip to main content
← All data ties

Grid Infrastructure Deployment And Resilience federal funding in FY2026

USAspending.gov records $787,830,264 in Grid Infrastructure Deployment And Resilience (CFDA 81.254) obligations for fiscal year 2026. The year-side award-record count on the pair is 13; the program extract lists 408 awards across years. That yearlyTrend cell is 11.2% of this program’s published obligation total of $7,043,649,945. The join is Grid Infrastructure Deployment And Resilience crossed with federal FY2026 — not every federal dollar in FY2026 and not a substation census, a utility roster, or a named-contractor file. Obligations are not outlays.

Key figures

  • Grid Infrastructure Deployment And Resilience FY2026: $787,830,264 in USAspending obligations (CFDA 81.254).
  • FY2026 is about 11.2% of the program all-year obligation total of $7,043,649,945.
  • The pair lists 13 FY2026 award records; the program extract lists 408 awards across years.
  • The join is Grid Infrastructure Deployment And Resilience × FY2026, not an interconnection queue, a State Energy Program twin, or a named-utility list.
  • Figures are obligations, not outlays; FEC donations do not fund this total.

How CFDA 81.254 meets fiscal year 2026 in the award file

The join is Grid Infrastructure Deployment And Resilience × FY2026. $787,830,264 sits only where CFDA 81.254 and fiscal year 2026 overlap in the yearlyTrend extract. Open /programs/81.254/ (CFDA 81.254) for the program table without this FY2026 filter, and /fiscal-years/2026/ (FY2026 federal spending) for the year table without this CFDA filter. Those hubs are parents, not addends to $787,830,264. The pair is not an interconnection queue, a State Energy Program twin, or a named-utility list.

Read /programs/81.254/ (CFDA 81.254) for the program rollup, /fiscal-years/2026/ (FY2026 federal spending) for the year rollup, /programs/ (All programs) for every CFDA hub, and /ties/ (All spending ties) for the rest of the join list. Do not add those pages into $787,830,264. Recipients are unpublished. Thirteen FY2026 award records against a large dollar cell is a thin grid-resilience file. Do not invent thirteen named utilities or contractors.

What CFDA 81.254 labels in FY2026

USAspending labels CFDA 81.254 as Grid Infrastructure Deployment And Resilience. That code produced $787,830,264 when crossed with fiscal year 2026. The program-wide hub does not require a FY2026 filter. The year hub does not require this CFDA. Only this tie applies both filters. The catalog title is GRID INFRASTRUCTURE DEPLOYMENT AND RESILIENCE. Transmission versus distribution versus other eligible work is not split inside this yearlyTrend cell. FY2026 figures can still move in later USAspending ingests.

FY2026 as the grid-infrastructure yearlyTrend cell

FY2026 on USAspending.gov is a federal fiscal year, not a calendar year and not a state fiscal year. $787,830,264 is the Grid Infrastructure Deployment And Resilience slice of that year in this extract, not the government-wide FY2026 total. FY2026 figures can still move in later USAspending ingests. Prefer /fiscal-years/2026/ if the live year table moved. Outlays are unpublished.

13 FY2026 awards are not 13 utilities

13 is the FY2026 award-record count published on this pair. 408 is the program-extract award-record count across years. Dividing $787,830,264 by 408 would mix a one-year dollar total with a multi-year row count, so this page does not publish that ratio as a typical award. Unique recipients are unpublished. Thirteen FY2026 award records against a large dollar cell is a thin grid-resilience file. Do not invent thirteen named utilities or contractors.

Treat 13 as award records on the FY2026 cell, not unique vendors and not a substation census, a utility roster, or a named-contractor file. Do not per-capita or per-recipient the dollar total; those denominators are unpublished. FEC contribution tables do not fund these awards. Utility names, project titles, and contractors are unpublished on this packet.

Utility rankings this grid-resilience join cannot support

Budget justifications, program evaluation reports, and press releases answer other questions. They are not the source of this cell. If a chart mixes an interconnection queue, a State Energy Program twin, or a named-utility list with CFDA 81.254 in FY2026, the chart has left this join. Utility names, project titles, and contractors are unpublished on this packet.

Cite USAspending.gov: Grid Infrastructure Deployment And Resilience (CFDA 81.254) obligated $787,830,264 in FY2026. Name Grid Infrastructure Deployment And Resilience and FY2026 together. Keep the obligation word. If /programs/81.254/ or /fiscal-years/2026/ has refreshed, prefer the live hub over this snapshot for current rows. The pair is not a utility directory, a mile-of-line inventory, or an outlay register. 11.2% of $7,043,649,945 is the program share on this packet, not a budget score.

Reading Grid Infrastructure beside FY2026

Open /programs/81.254/ for CFDA 81.254, /fiscal-years/2026/ for FY2026 federal spending, /programs/ (All programs) for other catalog lines, and /ties/ (All spending ties) for other pairs. None of those links convert this cell into an interconnection queue, a State Energy Program twin, or a named-utility list, into outlays this packet omits, or into a contractor list. Cite both sides: Grid Infrastructure Deployment And Resilience and FY2026, $787,830,264, USAspending.gov, obligations only.

Questions

How much did Grid Infrastructure Deployment And Resilience show in federal obligations in FY2026?
USAspending.gov records $787,830,264 in Grid Infrastructure Deployment And Resilience obligations for FY2026 (CFDA 81.254) across 13 awards. That is an obligation aggregate for the pair, not an outlay and not the program-wide $7,043,649,945.
Is Grid Infrastructure FY2026 money already spent on substations?
No. $787,830,264 is a yearlyTrend obligation sum, not an outlay. Payments from the Treasury can lag or differ. This packet has no outlay total for Grid Infrastructure Deployment And Resilience in FY2026. Original filings remain on USAspending.gov.
Do 13 awards mean 13 grid projects?
No. 13 is the FY2026 award-record count on this pair, not a published unique-recipient census. The program extract lists 408 awards across years. Modifications can add rows. Original filings remain on USAspending.gov. Keep both the CFDA number and the fiscal year in the citation.
Which pages parent Grid Infrastructure Deployment And Resilience and FY2026?
The CFDA 81.254 hub is the program parent. The FY2026 federal-spending hub is the year parent. All programs lists CFDA hubs. All spending ties lists other pairs. Prefer those tables after later ingests; this page quotes Grid Infrastructure Deployment And Resilience × FY2026 at $787,830,264.

USAspending.gov CFDA program yearlyTrend by fiscal year. Obligations are not outlays.