USAspending.gov records $656,211,749 in Grid Infrastructure Deployment And Resilience obligations (CFDA 81.254) with place of performance in Minnesota, across 14 awards. Fourteen instruments against $656.21 million imply about $46.87 million per award. This page joins DOE catalog 81.254 to the MN geography tag. It is not LIHEAP, not a utility census, and not cash already paid. Obligations are not outlays.
Key figures
- CFDA 81.254 shows $656,211,749 in Minnesota obligations on 14 awards.
- The mean is about $46.87 million per award.
- The catalog is DOE grid resilience 81.254, not LIHEAP.
- Minnesota is a place-of-performance tag, not a utility or project census.
- Figures are obligations, not outlays.
Minnesota paired with CFDA 81.254
CFDA 81.254 is titled GRID INFRASTRUCTURE DEPLOYMENT AND RESILIENCE. Crossed with Minnesota place of performance, obligations sum to $656,211,749 on 14 awards. The national 81.254 hub includes other states. Minnesota’s spending hub includes other programs. Only this intersection is reported here. $656,211,749 is an obligation aggregate from USAspending.gov, not an outlay and not a count of substations in the Twin Cities.
Fourteen awards is a infrastructure-grant pattern: grid-resilience assistance often posts as a modest number of large instruments. The join does not name recipients. Packet facts are $656,211,749, 14 awards, MN, and 81.254. Correlation is not causation. FEC donations do not fund this USAspending cell. Keep grid infrastructure and resilience and Minnesota together when reading $656,211,749.
81.254 is not LIHEAP in Minnesota
LIHEAP and weatherization use different CFDA numbers. Mixing those series into $656,211,749 would invent a broader total than this cell contains. Facts available: Minnesota, CFDA 81.254, $656,211,749, 14 awards. Utility names, project titles, and miles of line are unpublished.
The catalog title names grid infrastructure deployment and resilience, not a ranking of utilities. Dividing $656,211,749 by 14 yields about $46.87 million per award. Unique recipients are unpublished. 14 is not a utility or project census.
Minnesota geography on the grid-resilience tag
MN is the place-of-performance code. Awards billed to Minneapolis, Duluth, Rochester, or other in-state sites can share the tag. Awards coded to Wisconsin, Iowa, North Dakota, or South Dakota stay outside $656,211,749 even when activity later crosses those lines. The code does not convert $656.21 million into a transmission map.
Minnesota federal spending is the all-program parent. 81.254 is one row on Minnesota programs. $656.21 million is not the state’s complete federal footprint. Open Grid Infrastructure Deployment And Resilience in Minnesota for the filtered table, CFDA 81.254 for the catalog without a Minnesota filter, and All spending ties for other pairs. Do not add those parents into $656,211,749.
Reading 14 awards under $656.21 million
$656,211,749 ÷ 14 is about $46.87 million per award. That average is an infrastructure-grant scale, not a per-customer rebate, not a median. Net obligations can include downward modifications; the total shown is the aggregate in the facts. Treat 14 as a record count, not as 14 utilities.
Without a transaction register, you cannot see how many of the 14 rows are continuations, renewals, or corrections. Later ingests can restate $656,211,749 without changing the join key of 81.254 and MN. USAspending obligations can be positive new awards or net of downward modifications; $656,211,749 is the net total supplied in the facts. The pair remains grid infrastructure and resilience plus Minnesota. Do not treat $656,211,749 as an outlay series.
What the 81.254–Minnesota pair does not prove
A large 81.254 total tagged to Minnesota does not measure whether outages fell, and it does not equal construction completed. FEC donations do not fund this USAspending cell. Correlation is not causation. The headline remains $656,211,749 on 14 awards for grid infrastructure and resilience in Minnesota.
Keep both sides of the join: Grid Infrastructure Deployment And Resilience and Minnesota, obligations only. Do not annualize $656,211,749 without a year field—this packet publishes none. Do not treat 14 as a utility or project census. Quote USAspending.gov and the overlay path rather than an energy-transition story. Cite grid infrastructure and resilience together with Minnesota whenever you reuse $656,211,749.
Using the 81.254–Minnesota overlay
The overlay target is the Minnesota × CFDA 81.254 table. Open Grid Infrastructure Deployment And Resilience in Minnesota when you want the same $656,211,749 / 14-award cell in the site’s data chrome. CFDA 81.254 drops the Minnesota filter. Minnesota federal spending drops the CFDA filter. Minnesota programs lists other catalogs beside 81.254. All spending ties indexes other pairs.
This page exists because two tables meet: a CFDA program and a place-of-performance state. It does not exist to argue that Minnesota won or lost federal money, that donations paid for the awards, or that obligations equal cash. The pair is 81.254 plus MN. Obligations of $656,211,749 are not outlays. Original filings remain on USAspending.gov for this 81.254 × MN pair. 14 remains an award-record count, not a person, facility, or project census.
Questions
- How much grid-resilience funding is obligated in Minnesota?
- USAspending records $656,211,749 in CFDA 81.254 obligations with Minnesota place of performance on 14 awards. That is the pair total, not an outlay. Keep Grid Infrastructure Deployment And Resilience and Minnesota together when citing $656,211,749.
- Does 14 awards mean 14 Minnesota utilities?
- 14 is a USAspending award-record count, not a utility or project census. The implied mean is about $46.87 million per award. Unique recipients are unpublished. 14 is a record count, not a person or facility census.
- Is this Minnesota’s total federal energy spending?
- No. This join is CFDA 81.254 only. LIHEAP and other energy catalogs appear on separate Minnesota program pages. Nationwide 81.254 is not limited to Minnesota. Obligations of $656,211,749 are not outlays. The overlay is the live grid infrastructure and resilience–Minnesota table.
- Do these obligations equal construction finished?
- No. $656,211,749 is an obligation sum. Outlays are a different USAspending series. Drawdowns can lag the federal obligation. This packet has no outlay total. Original filings remain on USAspending.gov for this 81.254 × MN pair.
USAspending.gov CFDA program aggregates by place of performance state. Obligations are not outlays.