Highway Planning And Construction federal funding in FY2026

The yearlyTrend cell for Highway Planning And Construction in FY2026 is $34,273,527,714.68 on 16,789 awards (CFDA 20.205). The FY cell is 17.5% of the program-wide $195,401,706,270.29 book in this extract. The pair is a highway listing plus an open fiscal year, not a mile census and not pavement already placed. USAspending.gov is the source.

Key figures

  • CFDA 20.205 × FY2026 records $34,273,527,714.68 in USAspending highway obligations.
  • That open-year cell is 17.5% of the program-wide $195,401,706,270.29 book.
  • 16,789 FY2026 awards are not a mile or contractor census.
  • Cite obligations from USAspending.gov, not outlays.

CFDA 20.205 overlapping FY2026

The relationship is mechanical: one CFDA code, one fiscal year, one obligation sum. $34,273,527,714.68 is that sum for Highway Planning And Construction in 2026. A thick project-style file: tens of thousands of FY rows, still not a mile inventory. Broader books ($195,401,706,270.29; the FY2026 hub) remain on their own pages. /programs/20.205/ (CFDA 20.205) and /fiscal-years/2026/ (FY2026 federal spending) are those parents.

FY2026 figures can still move. A smaller share of the $195,401,706,270.29 highway book is an open-year slice, not a forecast of remaining lettings. Named contractors and award recipients are absent. transit formula grants (20.507) and Amtrak grants (20.315) are outside this cell. Campaign-finance filings do not fund these USAspending obligations.

Highway Planning And Construction as a catalog title beside FY2026

The official title is HIGHWAY PLANNING AND CONSTRUCTION. SpendingVault does not grade pavement condition or letting calendars. $34,273,527,714.68 is a FY2026 obligation sum, not a performance score. Mixing transit formula grants (20.507) and Amtrak grants (20.315) into $34,273,527,714.68 would invent a combined total the packet never computed. Program-wide obligations are $195,401,706,270.29 on 96,838 awards.

The FY cell is 17.5% of the program-wide $195,401,706,270.29 book in this extract. The source note says FY figures can be incomplete; this page does not annualize the remaining year. The All programs index still lists other catalog lines. The FY2026 federal spending hub still lists other FY2026 programs. Neither parent equals this cell.

16,789 FY2026 awards are not a census of miles, bridges, or contractors

16,789 is the FY2026 award-record count on CFDA 20.205, not 96,838 program-wide rows treated as miles, bridges, or contractors. Continuations and modifications add lines. This page does not publish a typical payment from $34,273,527,714.68 and 16,789. Unique recipients remain unpublished.

What the Highway Planning And Construction FY2026 table omits

No outlays, no named primes, no mile tables, no NHS-versus-local split. Quote Highway Planning And Construction and FY2026 with $34,273,527,714.68. Keep CFDA 20.205 in the citation. FEC donation tables are a different dataset and do not fund this cell.

Citing Highway Planning And Construction in FY2026

Open /programs/20.205/ for CFDA 20.205, /fiscal-years/2026/ for FY2026 federal spending, /programs/ for All programs, and /ties/ for All spending ties. Those parents are larger than this cell. Keep both join sides on the same line as $34,273,527,714.68. USAspending.gov remains the source.

A ties page exists because two tables meet. One table is CFDA 20.205. The other is fiscal year 2026. $34,273,527,714.68 is the obligation sum on that intersection, not a forecast and not a claim that Highway Planning And Construction caused road conditions to change. Step off this pair through the internal links. Keep Highway Planning And Construction and FY2026 together when citing $34,273,527,714.68. CFDA 20.205's program-wide award-record count is 96,838, not a FY2026-only census of miles, bridges, or contractors. Obligations of $34,273,527,714.68 are not outlays. Original filings remain on USAspending.gov for this 20.205 × FY2026 pair. Do not add parent hubs into this yearlyTrend cell. Campaign-finance tables do not fund these USAspending obligations. The 17.5% share is $34,273,527,714.68 divided by the program-wide $195,401,706,270.29, not a budget score. Unique recipients remain unpublished on this Highway Planning And Construction FY2026 join. Agency and place-of-performance splits are omitted from this packet. Quote CFDA 20.205, fiscal year 2026, and $34,273,527,714.68 in one sentence. The All programs index and All spending ties index are larger than this cell. A later USAspending ingest can restate $34,273,527,714.68 without changing the join keys. This page is not a mile, bridge, or contractor census. 16,789 FY2026 award records are not 96,838 program-wide rows.

Questions

How much Highway Planning And Construction was obligated in FY2026?
USAspending.gov records $34,273,527,714.68 in CFDA 20.205 obligations tagged to fiscal year 2026 across 16,789 awards. That open-year cell is 17.5% of the program-wide $195,401,706,270.29 book, not an outlay.
Do 16,789 awards mean 16,789 highway projects in FY2026?
No. 16,789 is a thick FY2026 award-record count, including possible modifications, not a project or mile census. The program-wide file lists 96,838 awards. USAspending.gov remains the source for this pair. USAspending.gov remains the source for this pair.
Is FY2026 highway spending complete?
Not necessarily. FY figures can be incomplete. FY2026 is 17.5% of $195,401,706,270.29. Later ingests can restate the cell. USAspending.gov remains the source for this pair. USAspending.gov remains the source for this pair. USAspending.gov remains the source for this pair.
Does $34,273,527,714.68 equal pavement already built?
No. $34,273,527,714.68 is an obligation aggregate. Outlays are unpublished. FEC donations do not fund this USAspending cell. USAspending.gov remains the source for this pair. USAspending.gov remains the source for this pair. USAspending.gov remains the source for this pair.

USAspending.gov CFDA program yearlyTrend by fiscal year. Obligations are not outlays.