Indian Housing Block Grants federal funding in South Dakota
Indian Housing Block Grants (CFDA 14.867) show $584,131,384.50 in USAspending.gov obligations with South Dakota as place of performance. Eleven awards carry that total. The join is a HUD NAHASDA-style block-grant listing crossed with a state location field, not South Dakota's entire housing budget and not a census of tribal housing authorities. The dollars are commitments, not Treasury outlays.
Key figures
- CFDA 14.867 in South Dakota shows $584,131,384.50 in USAspending obligations on 11 awards.
- Eleven awards are block-grant rows, not a tribe or unit census.
- The join is IHBG plus South Dakota place of performance, not all HUD housing dollars.
- The total is commitments, not completed homes or outlays.
South Dakota x 14.867 is a block-grant join, not a unit census
This page pairs CFDA 14.867, INDIAN HOUSING BLOCK GRANTS, with South Dakota place of performance. SpendingVault sums tagged obligations: $584,131,384.50 on 11 awards. Indian Housing Block Grants, in program language, fund affordable housing activities by eligible Indian tribes and tribally designated housing entities. This extract does not list tribes, units built, or waiting lists. Treat the pair as a catalog intersection, not a ranking of which state has more tribal housing need, and not a claim that 11 awards equal 11 tribes.
Other HUD listings — Section 8 HAP on 14.195, public housing, or different Native American housing codes — sit outside $584,131,384.50 unless they also carry 14.867. South Dakota's other federal listings live on the state programs index as separate joins. Correlation between this obligation sum and overcrowding statistics is not causation. Those statistics are not in the packet. Place of performance as South Dakota locates the tagged awards; it does not deposit $584,131,384.50 in the state treasury, and it does not prove every dollar stayed on a particular reservation after subawards.
11 awards at a high average commitment
Mean obligation is about $53.10 million if $584,131,384.50 were divided evenly across 11 lines. That ratio is not a published block-grant size. Formula-style IHBG awards often post as a small number of large rows to eligible recipients. Award count is a row count, including possible continuations. It is not a count of tribes, TDHEs, or housing units.
Eleven lines are scannable on the overlay. This page will not invent recipient names. Open Indian Housing Block Grants in South Dakota for the stored table. Do not convert 11 into a map of South Dakota reservations. The $584,131,384.50 total remains an obligation rollup on tagged awards. Inspect named lines rather than inferring a unit inventory.
Block-grant obligations are not keys already handed over
Housing block grants often obligate in formula awards and draw as activities proceed. The $584,131,384.50 headline is the obligation sum, not a punch-list of homes completed and not a Treasury outlay total. No fiscal year is attached. A HUD IHBG allocation table dated to a particular year is not automatically this join unless it uses CFDA 14.867, South Dakota geography, and the obligation metric.
The listing title is Indian Housing Block Grants. This extract does not split development from operations, and it does not split modernization from new construction. Those cuts would require award documentation beyond dollars, 11 awards, CFDA 14.867, and South Dakota. This page will not invent an activity-type share. Section 8 HAP is a different HUD listing.
What the South Dakota 14.867 table omits
The extract has no unit count, no tribe list, and no waiting-list statistic. Facts remain $584,131,384.50, 11 awards, CFDA 14.867, and South Dakota. This page will not invent a ranking against other states' 14.867 joins. Place-of-performance as a state code can sit beside tribal geography in ways this packet does not explain.
South Dakota federal spending and South Dakota programs place 14.867 among other listings. CFDA 14.867 is the national catalog line. All spending ties indexes other CFDA x state pairs. Mixing those shelves would invent a share of HUD spending the packet never computed. The $584,131,384.50 figure is the tagged pair only.
Where the 14.867 x South Dakota overlay lives
Start with Indian Housing Block Grants in South Dakota for the 11-award table behind $584,131,384.50. CFDA 14.867 is the nationwide listing. South Dakota federal spending and South Dakota programs give state context. All spending ties is the shelf for other program-by-state joins on the same obligation metric. Eleven awards totaling $584,131,384.50 remain a block-grant file, not a housing-unit census. Tribe names and unit counts are not in this packet. Waiting lists are omitted because they are not in the facts.
Questions
- How much Indian Housing Block Grant funding is obligated in South Dakota?
- USAspending.gov shows $584,131,384.50 in obligations for CFDA 14.867 with South Dakota as place of performance, across 11 awards. The sum is a commitment total on assistance awards, not outlays and not South Dakota's full housing budget. Other HUD listings are outside this join unless they also carry 14.867.
- Do 11 awards mean 11 tribes received grants?
- No. Award count is a row count of assistance awards and can include continuations. It is not a tribe census or a housing-unit count. The packet does not name recipients. See the South Dakota 14.867 overlay for named lines as USAspending stored them.
- Is this South Dakota's entire tribal housing budget?
- No. The join is CFDA 14.867 crossed with South Dakota place of performance. Other HUD Native American housing codes and Section 8 listings use different CFDA numbers. Those dollars are not inside $584,131,384.50 unless the award also carries 14.867.
- Is $584 million already spent on South Dakota tribal housing?
- Not on this metric. Obligations are recorded commitments on assistance awards. Outlays are payments from the Treasury. The $584,131,384.50 headline is the obligation rollup in SpendingVault's extract. Units completed and remaining balances are not published in this packet.
USAspending.gov CFDA program aggregates by place of performance state. Obligations are not outlays.