RAYTHEON COMPANY
MCKINNEY, Texas
Total Received
$4.75B
Total Awards
258
State
Texas
Last Updated
Mar 31, 2026
Yearly Funding Trend
$4.11B24
$638.5M25
Top 50 Awards to RAYTHEON COMPANY
Largest individual federal awards on record for this recipient, ranked by obligated amount. Data through March 31, 2026.
| Award | Awarding Agency | Program | Place | FY | Obligation |
|---|---|---|---|---|---|
CONT_AWD_FA862018C2001_9700_-NONE-_-NONE- MQ-9 REAPER FY17-19 DAS-4 PRODUCTION | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $364,464,310 |
CONT_AWD_W31P4Q07C0088_9700_-NONE-_-NONE- CONTRACT IF FOR THE PROCUREMENT OF CONTRACTOR LOGISTICS SUPPORT FOR THE TUBE-LAUNCHED OPTICALLY TRACKED WIRELESS-GUIDED IMPROVED TARGET ACQUISITION SYSTEM. | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $344,856,753 |
CONT_AWD_H9240821C0001_9700_-NONE-_-NONE- SILENT KNIGHT RADAR SYSTEMS DELIVERY DATE CHANGE AND FUNDING | Department of Defense U.S. Special Operations Command | — | FOREST, MS-03 | 2024 | $277,221,853 |
CONT_AWD_N0001915C0116_9700_-NONE-_-NONE- THE PURPOSE OF THIS MODIFICATION IS TO DEOOBLIGATE FY26 CANCELLING FUNDS. | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $255,927,894 |
CONT_AWD_FA861124CB001_9700_-NONE-_-NONE- THE F-22 SENSOR ENHANCEMENTS (SEE) PROGRAM MODERNIZES THE F-22 SENSOR CAPABILITIES TO MAINTAIN AIR SUPERIORITY. | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $236,713,657 |
CONT_AWD_FA862020C2000_9700_-NONE-_-NONE- MQ-9 REAPER DAS-4 FY20 PRODUCTION | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $195,153,942 |
CONT_AWD_N0001921C0004_9700_-NONE-_-NONE- THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE $77,000 FROM CLIN 0046 AND RE-OBLIGATE FUNDS TO CLIN 0044. | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $186,186,638 |
CONT_AWD_FA852819C0002_9700_-NONE-_-NONE- DEOBLIGATION OF EXCESS FUNDS | Department of Defense Defense Contract Management Agency | — | MCKINNEY, TX-03 | 2025 | $138,707,161 |
CONT_AWD_W909MY16C0007_9700_-NONE-_-NONE- ORDER TO PROVIDE THE ARMY THE CAPABILITY TO REPROGRAM LEGACY ADVANCED VIDEO PROCESSOR (AVP) CIRCUIT CARD ASSEMBLIES (CCAS) | Department of Defense Department of the Army | — | RICHARDSON, TX-32 | 2025 | $129,287,813 |
CONT_AWD_H9240824C6972_9700_-NONE-_-NONE- SILENT KNIGHT RADAR SYSTEMS (NON-FMS) FUNDING ACTION | Department of Defense U.S. Special Operations Command | — | FOREST, MS-03 | 2024 | $120,175,622 |
CONT_AWD_W56KGY23F0025_9700_W56KGY19D0005_9700 ADMINSTRATIVE UPDATES ON COMMON SENSOR PAYLOAD (CSP) CONTRACT LINE NUMBER (CLIN) AND SUB-LINE ITEM NUMBER (SLIN) | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $118,325,430 |
CONT_AWD_FA857722C0002_9700_-NONE-_-NONE- CONTRACTOR LOGISTICS SUPPORT (CLS) AND SERVICES APPLICABLE TO THE REAPER MQ-9 SENSOR PROGRAM. | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $111,713,100 |
CONT_AWD_W31P4Q19C0069_9700_-NONE-_-NONE- CONTACT IS FOR THE PROCUREMENT OF CONTRACTOR LOGISTIC SUPPORT FOR THE TUBE-LAUNCHED OPTICALLY-TRACED WIRELESS IMPROVED TARGET ACQUISITION. | Department of Defense Department of the Army | — | GRAND PRAIRIE, TX-33 | 2024 | $85,365,800 |
CONT_AWD_FA868924FB005_9700_FA868921D2021_9700 MQ-9 REAPER INTELLIGENT ELECTRONICS UNIT PRODUCTION | Department of Defense Department of the Air Force | — | FORT WORTH, TX-12 | 2024 | $77,515,454 |
CONT_AWD_N0038323F0TH1_9700_N0038322DTH01_9700 MTS FLIR PBL SECOND DELIVERY ORDER. | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $77,215,387 |
CONT_AWD_FA861517C6051_9700_-NONE-_-NONE- F-16 MMCU PROGRAM | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $75,552,732 |
CONT_AWD_H9240318F0031_9700_H9222216D0033_9700 SILENT KNIGHT RADAR (SKR) SYSTEM | Department of Defense U.S. Special Operations Command | — | FOREST, MS-03 | 2024 | $69,436,551 |
CONT_AWD_W56KGY20F0010_9700_W56KGY19D0005_9700 COST AND PERFORMANCE REPORT (CDRL) FUNDING AND PERFORMANCE WORK STATEMENT (PWS) UPDATE FOR COMMON SENSOR PAYLOAD (CSP) SERVICES. | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $60,626,650 |
CONT_AWD_W909MY23C0004_9700_-NONE-_-NONE- THE OBJECTIVE OF THIS EFFORT IS TO DEVELOP, MANUFACTURE, AND DELIVER THIRD GENERATION FORWARD LOOKING INFARED B-KITS. | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $60,594,392 |
CONT_AWD_N0038323F0TH2_9700_N0038322DTH01_9700 RECONCILIATION OF MTS FLIR PBL DELIVERY ORDER - PERFORMANCE PERIOD THREE. | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $60,282,531 |
CONT_AWD_N0038319FHC02_9700_N0038315G005D_9700 CIRCUIT CARD ASSEMB | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $59,152,723 |
CONT_AWD_N0038324FWC02_9700_N0038320DWC01_9700 ATFLIR REPAIRS | Department of Defense Department of the Navy | — | GRAND PRAIRIE, TX-33 | 2024 | $57,458,263 |
CONT_AWD_W31P4Q22C0058_9700_-NONE-_-NONE- ITAS CLS TOW | Department of Defense Department of the Army | — | GRAND PRAIRIE, TX-33 | 2024 | $57,154,074 |
CONT_AWD_W909MY24F0006_9700_W909MY19D0015_9700 SECOND GENERATION (2GF) COMMANDERS INDEPENDENT THERMAL VIEWER (CITV) HARDWARE COMPONENTS. ADD NOT SEPARATELY PRICED (NSP) SERVICE CLIN AND TWO NO COST CLINS TO REPLACE DAMAGED GOV… | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $54,823,073 |
CONT_AWD_W909MY23F0005_9700_W909MY19D0015_9700 14TH DELIVERY ORDER FOR TACOM AND ABRAMS | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $54,739,943 |
CONT_AWD_N0038318FHC00_9700_N0038315G005D_9700 CIRCUIT CARD ASSEMB, ATFLIR REPAIRS | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $52,728,755 |
CONT_AWD_FA868921F2003_9700_FA868921D2021_9700 MQ-9 REAPER CAMERA UPGRADE AND SPARES | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $51,385,028 |
CONT_AWD_7006_9700_N0038315G005D_9700 CIRCUIT CARD ASSEMB | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2025 | $48,376,519 |
CONT_AWD_N0016424FJ027_9700_N0016422GJQ65_9700 AN/DAS-4 MULTI-SPECTRAL TARGETING SYSTEM | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $47,904,325 |
CONT_AWD_N0038320FWC00_9700_N0038320DWC01_9700 REPAIR OF 39 NIINS (SUBCOMPONENTS) OF THE ATFLIR SYSTEM. | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2025 | $45,190,389 |
CONT_AWD_N0038324F0TH1_9700_N0038322DTH01_9700 H-60 MTS FLIR PBL - PERIOD PERFORMANCE 4 DELIVERY ORDER | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $40,061,515 |
CONT_AWD_SPRPA119FCB04_9700_SPRPA119GCB01_9700 EU: ELECTRONIC UNIT | Department of Defense Defense Logistics Agency | — | MCKINNEY, TX-03 | 2024 | $36,726,622 |
CONT_AWD_FA865023C9312_9700_-NONE-_-NONE- DEFENSE EXPERIMENTATION USING COMMERCIAL SPACE INTERNET (DEUCSI), ROLLING THUNDER MULTI-BAND MULTI-ORBIT BLOS COMMUNICATION | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $36,138,347 |
CONT_AWD_W909MY24F0019_9700_W909MY19D0015_9700 17TH DELIVERY ORDER FOR SECOND GENERATION (2GF) COMMANDERS INDEPENDENT THERMAL VIEWER (CITV) HARDWARE COMPONENTS. | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2024 | $34,138,008 |
CONT_AWD_H9240319F0048_9700_H9222218D0003_9700 PHASE II SKR SOFTWARE DEVELOPMENT POP EXTENSION AND SOFARS | Department of Defense U.S. Special Operations Command | — | MCKINNEY, TX-03 | 2024 | $33,361,481 |
CONT_AWD_SPRDL120C0188_9700_-NONE-_-NONE- THE PURPOSE OF MODIFICATION P00016 IS TO INCORPORATE AN APPROVED RFV AND TRANSFER GFE FROM THIS CONTRACT TO SPRDL1-23-F-0229 ALONG WITH AN EXCEL SPREADSHEET OF THE ITEMS. | Department of Defense Defense Logistics Agency | — | MCKINNEY, TX-03 | 2024 | $32,248,578 |
CONT_AWD_FA861222FB005_9700_FA861220D0022_9700 DI CONSORTIUM THE FOLLOWING IS IN ACCORDANCE WITH THE DI DEPLOYMENTS CLIN 0002 AND THE UNPRICED CHANGE ORDER (UCO). THIS CLIN HAS A PERIOD OF PERFORMANCE (POP) FROM 13 MARCH 2023… | Department of Defense Department of the Air Force | — | MCKINNEY, TX-04 | 2024 | $31,612,573 |
CONT_AWD_FA238524CB037_9700_-NONE-_-NONE- SPECIFICALLY CONSTRAINED LOW-VOLUME AIRCRAFT MULTI-BAND, DIRECTIONAL SATCOM ANTENNAS | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $31,000,000 |
CONT_AWD_FA850925FB006_9700_FA850925DB004_9700 AN/AAS-54 EO/IR SYSTEM RETROFIT KIT DEVELOPMENT AND PRODUCTION LINE | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2025 | $29,995,590 |
CONT_AWD_FA865020C9321_9700_-NONE-_-NONE- DEFENSE EXPERIMENTATION USING COMMERCIAL SPACE INTERNET (DEUSCI) | Department of Defense Department of the Air Force | — | MCKINNEY, TX-03 | 2024 | $29,906,919 |
CONT_AWD_W909MY23F0023_9700_W909MY19D0015_9700 15TH DELIVERY ORDER FOR TACOM, ABRAMS, & DLA. | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2025 | $24,584,152 |
CONT_AWD_N0001420C1018_9700_-NONE-_-NONE- NAVAL SURVEILLANCE APPLICATION UPGRADE | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $23,287,384 |
CONT_AWD_N0038323FPF02_9700_N0038319GPF01_9700 TRANSMITTER, RADAR, | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2025 | $23,203,894 |
CONT_AWD_N0016422FJ026_9700_N0016417GJQ02_9700 MULTI-SPECTRAL TARGETING SYSTEM DAS-3 | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $23,192,220 |
CONT_AWD_HR001121C0078_9700_-NONE-_-NONE- DARPA RESEARCH PROJECT | Department of Defense Defense Advanced Research Projects Agency | — | MCKINNEY, TX-03 | 2024 | $22,629,005 |
CONT_AWD_W909MY25F0025_9700_W909MY19D0015_9700 SECOND GENERATION (2GF) COMMANDERS INDEPENDENT THERMAL VIEWER (CITV) HARDWARE COMPONENTS | Department of Defense Department of the Army | — | MCKINNEY, TX-03 | 2025 | $22,509,422 |
CONT_AWD_SPRHA425C0041_9700_-NONE-_-NONE- F-16 ELECTRICAL CHASSIS, POWER SUPPLIERS AND CIRCUIT CARD ASSEMBLIES. | Department of Defense Defense Logistics Agency | — | MCKINNEY, TX-03 | 2025 | $22,154,300 |
CONT_AWD_N0016422FJ183_9700_N0016422GJQ65_9700 LABOR SUPPORT TI-500 | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $18,075,779 |
CONT_AWD_N0038321FWC03_9700_N0038320DWC01_9700 ATFLIR REPAIR REQUIREMENTS | Department of Defense Department of the Navy | — | MCKINNEY, TX-03 | 2024 | $17,877,004 |
CONT_AWD_FA862017C2009_9700_-NONE-_-NONE- MEDIUM ALTITUDE LONG ENDURANCE TACTICAL (MALET) LEAD-OFF HITTER SOFTWARE LINE FOR MQ-9 WITH MULTI-SPECTRAL TARGETING SYSTEM (MTS-B) | Department of Defense Defense Contract Management Agency | — | MCKINNEY, TX-03 | 2024 | $17,494,099 |
Top 50 awards shown, ranked by obligated amount. Dates reflect performance period; last-modified dates match USAspending.gov. Complete listings include all transaction history going back to FY2024.
Industries
View All→12345678910
SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING$2.33B
OTHER AIRCRAFT PARTS AND AUXILIARY EQUIPMENT MANUFACTURING$1.15B
OTHER GUIDED MISSILE AND SPACE VEHICLE PARTS AND AUXILIARY EQUIPMENT MANUFACTURING$430.2M
AIRCRAFT MANUFACTURING$227.5M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)$214.7M
OTHER ELECTRONIC COMPONENT MANUFACTURING$177.6M
BARE PRINTED CIRCUIT BOARD MANUFACTURING$69.5M
ENGINEERING SERVICES$69.1M
RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING$45.8M
OTHER MEASURING AND CONTROLLING DEVICE MANUFACTURING$11.3M
Source: USAspending.gov · All Recipients · Texas